FHWA NBI 2024 Inspection record Public-domain dataset

3RD AVE

Carrying 3RD AVE over CALAPOOIA RV

AT BRYANT PARK, Linn, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
11 t Inventory load rating Lower than 97% of rated Oregon bridges

3RD AVE in Linn, Oregon sits above 3% of rated Oregon bridges on inventory load rating (11 t), while its 1960 build year is earlier than 69% of Linn's recorded-year cohort (566 bridges).

3RD AVE in Linn, Oregon is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1960, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 2. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:43C09 000 00000

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · SUB-LED · ARTERIAL-ADT · LIGHT-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 3RD AVE

The 3RD AVE bridge in Linn, Oregon carries 3RD AVE over CALAPOOIA RV. It was built in 1960, making it 66 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 67.4 meters (221 feet) end to end. Daily traffic averages 1,236 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 2/9. The weakest component sits in critical condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How 3RD AVE compares

▼ 20.8
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
566
Bridges in Linn · 100 in Poor condition

Age against the county: built in 1960, earlier than 392 of Linn's 566 bridges with a recorded construction year (69%), against a county median build year of 1967. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

3RD AVE 11.0 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

3RD AVE vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

11 Top 97% higher than 3% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
2/9
Poor (1–4)
Inventory Load Rating
11.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Linn inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 566 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1960
Material
Concrete Continuous
Number of Spans
2
Structure Length
67.4 m (221 ft)
Deck Width
8.4 m (28 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,236 vehicles/day
Structure Number
43C09 000 00000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in critical condition (2/9), with severe deterioration recorded on the inspecting agency's 0-9 scale.

How to read this record

3RD AVE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare 3RD AVE against other structures in Linn and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 3RD AVE?

3RD AVE in Linn, Oregon has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 2/9 on the FHWA's 0–9 scale.

How often is 3RD AVE inspected?

3RD AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,236 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 3RD AVE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 3RD AVE?

3RD AVE has an NBI inventory load rating of 11.0 metric tons.

Who is responsible for maintaining 3RD AVE?

3RD AVE is owned and maintained by City/Municipal Highway Agency.

How old is 3RD AVE and does age affect safety?

3RD AVE was built in 1960, making it 66 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.