FHWA NBI 2024 Inspection record Public-domain dataset

PIONEER RD

Carrying PIONEER RD over DEAD OX CANAL

060 NORTH OF SHOP, Malheur, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
40 t Inventory load rating Higher than 74% of rated Oregon bridges

PIONEER RD in Malheur, Oregon sits above 74% of rated Oregon bridges on inventory load rating (40 t), while its 1940 build year is earlier than 96% of Malheur's recorded-year cohort (181 bridges).

PIONEER RD in Malheur, Oregon is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1940, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:45C308091700000

PRE-1950 · PRESTRESS · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • PRE-1950 Pre-1950
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PIONEER RD

The PIONEER RD bridge in Malheur, Oregon carries PIONEER RD over DEAD OX CANAL. It was built in 1940, making it 86 years old today. It was last reconstructed in 1983, extending its service life. The structure is built primarily of prestressed concrete and spans 2 sections, stretching 25.0 meters (82 feet) end to end. Daily traffic averages 272 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How PIONEER RD compares

▲ 8.1
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
181
Bridges in Malheur · 5 in Poor condition

Age against the county: built in 1940, earlier than 173 of Malheur's 181 bridges with a recorded construction year (96%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

PIONEER RD 39.9 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

PIONEER RD vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

40 Top 26% higher than 74% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Malheur inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 181 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1940
Last Reconstructed
1983
Material
Prestressed Concrete
Number of Spans
2
Structure Length
25.0 m (82 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
272 vehicles/day
Structure Number
45C308091700000

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PIONEER RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PIONEER RD against other structures in Malheur and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PIONEER RD?

PIONEER RD in Malheur, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PIONEER RD inspected?

PIONEER RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 272 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PIONEER RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PIONEER RD?

PIONEER RD has an NBI inventory load rating of 39.9 metric tons.

Who is responsible for maintaining PIONEER RD?

PIONEER RD is owned and maintained by County Highway Agency.

How old is PIONEER RD and does age affect safety?

PIONEER RD was built in 1940, making it 86 years old and last reconstructed in 1983.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.