FHWA NBI 2024 Inspection record Public-domain dataset

MONMOUTH CUT OFF

Carrying MONMOUTH CUT OFF over N FK ASH CREEK

CITY OF DALLAS, Polk, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
56 t Inventory load rating Higher than 93% of rated Oregon bridges

MONMOUTH CUT OFF in Polk, Oregon sits above 93% of rated Oregon bridges on inventory load rating (56 t), while its 1979 build year is earlier than 44% of Polk's recorded-year cohort (161 bridges).

MONMOUTH CUT OFF in Polk, Oregon is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:53B144000000000

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · SUB-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: MONMOUTH CUT OFF

The MONMOUTH CUT OFF bridge in Polk, Oregon carries MONMOUTH CUT OFF over N FK ASH CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 4,473 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How MONMOUTH CUT OFF compares

▲ 24.4
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
161
Bridges in Polk · 11 in Poor condition

Age against the county: built in 1979, earlier than 71 of Polk's 161 bridges with a recorded construction year (44%), against a county median build year of 1974. This is one of the newer structures in its county.

MONMOUTH CUT OFF 56.2 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

MONMOUTH CUT OFF vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

56 Top 7% higher than 93% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
56.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Polk inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 161 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
9.1 m (30 ft)
Deck Width
11.0 m (36 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,473 vehicles/day
Structure Number
53B144000000000

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.

How to read this record

MONMOUTH CUT OFF is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MONMOUTH CUT OFF against other structures in Polk and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MONMOUTH CUT OFF?

MONMOUTH CUT OFF in Polk, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is MONMOUTH CUT OFF inspected?

MONMOUTH CUT OFF's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,473 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MONMOUTH CUT OFF is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MONMOUTH CUT OFF?

MONMOUTH CUT OFF has an NBI inventory load rating of 56.2 metric tons.

Who is responsible for maintaining MONMOUTH CUT OFF?

MONMOUTH CUT OFF is owned and maintained by City/Municipal Highway Agency.

How old is MONMOUTH CUT OFF and does age affect safety?

MONMOUTH CUT OFF was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.