FHWA NBI 2024 Inspection record Public-domain dataset

STAGE GULCH ROAD

Carrying STAGE GULCH ROAD over FURNISH DITCH

1.7 MI E OF HWY 395, Umatilla, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
12 t Inventory load rating Lower than 96% of rated Oregon bridges

STAGE GULCH ROAD in Umatilla, Oregon sits above 4% of rated Oregon bridges on inventory load rating (12 t), while its 1920 build year is earlier than 99% of Umatilla's recorded-year cohort (321 bridges).

STAGE GULCH ROAD in Umatilla, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1920, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:59C208118600121

PRE-1950 · STEEL · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · LIGHT-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: STAGE GULCH ROAD

The STAGE GULCH ROAD bridge in Umatilla, Oregon carries STAGE GULCH ROAD over FURNISH DITCH. It was built in 1920, making it 106 years old today. It was last reconstructed in 1995, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 121 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How STAGE GULCH ROAD compares

▼ 20.1
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
321
Bridges in Umatilla · 13 in Poor condition

Age against the county: built in 1920, earlier than 318 of Umatilla's 321 bridges with a recorded construction year (99%), against a county median build year of 1969. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

STAGE GULCH ROAD 11.7 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

STAGE GULCH ROAD vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

12 Top 96% higher than 4% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
11.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Umatilla inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 321 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1920
Last Reconstructed
1995
Material
Steel
Number of Spans
1
Structure Length
10.4 m (34 ft)
Deck Width
6.5 m (21 ft)
Owner
County Highway Agency
Avg Daily Traffic
121 vehicles/day
Structure Number
59C208118600121

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether STAGE GULCH ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare STAGE GULCH ROAD against other structures in Umatilla and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for STAGE GULCH ROAD?

STAGE GULCH ROAD in Umatilla, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is STAGE GULCH ROAD inspected?

STAGE GULCH ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 121 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. STAGE GULCH ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for STAGE GULCH ROAD?

STAGE GULCH ROAD has an NBI inventory load rating of 11.7 metric tons.

Who is responsible for maintaining STAGE GULCH ROAD?

STAGE GULCH ROAD is owned and maintained by County Highway Agency.

How old is STAGE GULCH ROAD and does age affect safety?

STAGE GULCH ROAD was built in 1920, making it 106 years old and last reconstructed in 1995.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.