FHWA NBI 2024 Inspection record Public-domain dataset

SPRING HILL RD

Carrying SPRING HILL RD over TUALATIN RIVER

004 MI S R/R ING, Washington, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating Lower than 55% of rated Oregon bridges

SPRING HILL RD in Washington, Oregon sits above 45% of rated Oregon bridges on inventory load rating (28 t), while its 1972 build year is earlier than 64% of Washington's recorded-year cohort (326 bridges).

SPRING HILL RD in Washington, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1972, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:671256062900060

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SPRING HILL RD

The SPRING HILL RD bridge in Washington, Oregon carries SPRING HILL RD over TUALATIN RIVER. It was built in 1972, making it 54 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 49.4 meters (162 feet) end to end. Daily traffic averages 1,274 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How SPRING HILL RD compares

▼ 3.9
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
326
Bridges in Washington · 8 in Poor condition

Age against the county: built in 1972, earlier than 209 of Washington's 326 bridges with a recorded construction year (64%), against a county median build year of 1982. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SPRING HILL RD 27.9 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

SPRING HILL RD vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

28 Top 55% higher than 45% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
27.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Washington inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 326 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1972
Material
Prestressed Concrete
Number of Spans
4
Structure Length
49.4 m (162 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,274 vehicles/day
Structure Number
671256062900060

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether SPRING HILL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SPRING HILL RD against other structures in Washington and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPRING HILL RD?

SPRING HILL RD in Washington, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SPRING HILL RD inspected?

SPRING HILL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,274 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPRING HILL RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPRING HILL RD?

SPRING HILL RD has an NBI inventory load rating of 27.9 metric tons.

Who is responsible for maintaining SPRING HILL RD?

SPRING HILL RD is owned and maintained by County Highway Agency.

How old is SPRING HILL RD and does age affect safety?

SPRING HILL RD was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.