FHWA NBI 2024 Inspection record Public-domain dataset

S 141

Carrying S 141 over NEVADA CREEK

13M NW AVON, Powell, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: S 141

The S 141 bridge in Powell, Montana carries S 141 over NEVADA CREEK. It was built in 1936, making it 90 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 17.6 meters (58 feet) end to end. Daily traffic averages 1,564 vehicles, placing it in the moderately-trafficked tier of Montana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How S 141 compares

▼ 6.2
Load rating vs Montana average (30.7 t)
Bottom 28%
Lower load rating than 72% of Montana bridges
112
Bridges in Powell · 5 in Poor condition
S 141 24.5 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
48.5 / 100 - historical 20–49.9 band
Structural adequacy /55
22.8
Serviceability /30
25.7
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1936
Material
Wood or Timber
Number of Spans
3
Structure Length
17.6 m (58 ft)
Deck Width
10.2 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,564 vehicles/day
Structure Number
P00041013+01391

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

S 141 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare S 141 against other structures in Powell and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S 141?

S 141 in Powell, Montana has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is S 141 inspected?

S 141's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,564 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S 141 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S 141?

S 141 has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining S 141?

S 141 is owned and maintained by State Highway Agency.

How old is S 141 and does age affect safety?

S 141 was built in 1936, making it 90 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.