FHWA NBI 2024 Inspection record Public-domain dataset

LRD BIG GREEN RD

Carrying LRD BIG GREEN RD over BIG GREEN RIVER

0.2M S JCT CTH K, Grant, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
13 t Inventory load rating

Bridge Snapshot: LRD BIG GREEN RD

The LRD BIG GREEN RD bridge in Grant, Wisconsin carries LRD BIG GREEN RD over BIG GREEN RIVER. It was built in 1919, making it 107 years old today. The structure is built primarily of steel and spans 1 section, stretching 15.8 meters (52 feet) end to end. Daily traffic averages 53 vehicles, placing it in the lower-traffic tier of Wisconsin bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 13.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LRD BIG GREEN RD compares

▼ 20.3
Load rating vs Wisconsin average (33.3 t)
Bottom 1%
Lower load rating than 99% of Wisconsin bridges
385
Bridges in Grant · 17 in Poor condition
LRD BIG GREEN RD 13.0 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
30.1 / 100 - historical 20–49.9 band
Structural adequacy /55
2.2
Serviceability /30
13.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
13.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1919
Material
Steel
Number of Spans
1
Structure Length
15.8 m (52 ft)
Deck Width
5.2 m (17 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
53 vehicles/day
Structure Number
P22015800000000

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

LRD BIG GREEN RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare LRD BIG GREEN RD against other structures in Grant and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LRD BIG GREEN RD?

LRD BIG GREEN RD in Grant, Wisconsin has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is LRD BIG GREEN RD inspected?

LRD BIG GREEN RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 53 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LRD BIG GREEN RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LRD BIG GREEN RD?

LRD BIG GREEN RD has an NBI inventory load rating of 13.0 metric tons.

Who is responsible for maintaining LRD BIG GREEN RD?

LRD BIG GREEN RD is owned and maintained by Town/Township Highway Agency.

How old is LRD BIG GREEN RD and does age affect safety?

LRD BIG GREEN RD was built in 1919, making it 107 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.