FHWA NBI 2024 Inspection record Public-domain dataset

I80 EB (LR1009)

Carrying I80 EB (LR1009) over RAMPS G & H SR 8004

EXIT 277(42)TPKE-PA940, Carbon, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
30 t Inventory load rating Lower than 79% of rated Pennsylvania bridges

I80 EB (LR1009) in Carbon, Pennsylvania sits above 21% of rated Pennsylvania bridges on inventory load rating (30 t), while its 1965 build year is earlier than 31% of Carbon's recorded-year cohort (134 bridges).

I80 EB (LR1009) in Carbon, Pennsylvania is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000008976

INTERSTATE-ERA · PRESTRESS · MULTI-SPAN · SUB-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I80 EB (LR1009)

The I80 EB (LR1009) bridge in Carbon, Pennsylvania carries I80 EB (LR1009) over RAMPS G & H SR 8004. It was built in 1965, making it 61 years old today. It was last reconstructed in 1985, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 38.4 meters (126 feet) end to end. Daily traffic averages 8,087 vehicles, placing it in the moderately-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How I80 EB (LR1009) compares

▼ 8.5
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
134
Bridges in Carbon · 25 in Poor condition

Age against the county: built in 1965, earlier than 41 of Carbon's 134 bridges with a recorded construction year (31%), against a county median build year of 1959. This is one of the newer structures in its county.

I80 EB (LR1009) 29.9 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

I80 EB (LR1009) vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

30 Top 79% higher than 21% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
29.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Carbon inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 134 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Last Reconstructed
1985
Material
Prestressed Concrete
Number of Spans
3
Structure Length
38.4 m (126 ft)
Deck Width
19.4 m (64 ft)
Owner
State Highway Agency
Avg Daily Traffic
8,087 vehicles/day
Structure Number
000000000008976

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear on file for this vintage.

How to read this record

I80 EB (LR1009) is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I80 EB (LR1009) against other structures in Carbon and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I80 EB (LR1009)?

I80 EB (LR1009) in Carbon, Pennsylvania has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is I80 EB (LR1009) inspected?

I80 EB (LR1009)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 8,087 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I80 EB (LR1009) is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I80 EB (LR1009)?

I80 EB (LR1009) has an NBI inventory load rating of 29.9 metric tons.

Who is responsible for maintaining I80 EB (LR1009)?

I80 EB (LR1009) is owned and maintained by State Highway Agency.

How old is I80 EB (LR1009) and does age affect safety?

I80 EB (LR1009) was built in 1965, making it 61 years old and last reconstructed in 1985.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.