FHWA NBI 2024 Inspection record Public-domain dataset

SR 3014

Carrying SR 3014 over NORTH CAMP RUN

WAUKESHA, Clearfield, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
24 t Inventory load rating Lower than 89% of rated Pennsylvania bridges

SR 3014 in Clearfield, Pennsylvania sits above 11% of rated Pennsylvania bridges on inventory load rating (24 t), while its 1938 build year is earlier than 78% of Clearfield's recorded-year cohort (292 bridges).

SR 3014 in Clearfield, Pennsylvania is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1938, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000011821

PRE-1950 · STEEL · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 3014

The SR 3014 bridge in Clearfield, Pennsylvania carries SR 3014 over NORTH CAMP RUN. It was built in 1938, making it 88 years old today. It was last reconstructed in 1951, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 168 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How SR 3014 compares

▼ 14.8
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
292
Bridges in Clearfield · 41 in Poor condition

Age against the county: built in 1938, earlier than 227 of Clearfield's 292 bridges with a recorded construction year (78%), against a county median build year of 1970. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 3014 23.6 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SR 3014 vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

24 Top 89% higher than 11% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
23.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Clearfield inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 292 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1938
Last Reconstructed
1951
Material
Steel
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
7.1 m (23 ft)
Owner
State Highway Agency
Avg Daily Traffic
168 vehicles/day
Structure Number
000000000011821

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear on file for this vintage.

How to read this record

SR 3014 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 3014 against other structures in Clearfield and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 3014?

SR 3014 in Clearfield, Pennsylvania has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is SR 3014 inspected?

SR 3014's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 168 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 3014 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 3014?

SR 3014 has an NBI inventory load rating of 23.6 metric tons.

Who is responsible for maintaining SR 3014?

SR 3014 is owned and maintained by State Highway Agency.

How old is SR 3014 and does age affect safety?

SR 3014 was built in 1938, making it 88 years old and last reconstructed in 1951.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.