FHWA NBI 2024 Inspection record Public-domain dataset

SR 0080 WBL

Carrying SR 0080 WBL over OVER S.R. 2028

1.5 MI E OF MIFFLINVILLE, Columbia, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating Higher than 65% of rated Pennsylvania bridges

SR 0080 WBL in Columbia, Pennsylvania sits above 65% of rated Pennsylvania bridges on inventory load rating (42 t), while its 1964 build year is earlier than 46% of Columbia's recorded-year cohort (271 bridges).

SR 0080 WBL in Columbia, Pennsylvania is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1964, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000012522

INTERSTATE-ERA · STEEL · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 0080 WBL

The SR 0080 WBL bridge in Columbia, Pennsylvania carries SR 0080 WBL over OVER S.R. 2028. It was built in 1964, making it 62 years old today. It was last reconstructed in 2006, extending its service life. The structure is built primarily of steel continuous and spans 2 sections, stretching 35.1 meters (115 feet) end to end. Daily traffic averages 14,651 vehicles, placing it in the heavily-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How SR 0080 WBL compares

▲ 3.3
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
271
Bridges in Columbia · 27 in Poor condition

Age against the county: built in 1964, earlier than 126 of Columbia's 271 bridges with a recorded construction year (46%), against a county median build year of 1964.

SR 0080 WBL 41.7 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SR 0080 WBL vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

42 Top 35% higher than 65% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
41.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Columbia inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 271 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1964
Last Reconstructed
2006
Material
Steel Continuous
Number of Spans
2
Structure Length
35.1 m (115 ft)
Deck Width
13.3 m (44 ft)
Owner
State Highway Agency
Avg Daily Traffic
14,651 vehicles/day
Structure Number
000000000012522

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 0080 WBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 0080 WBL against other structures in Columbia and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 0080 WBL?

SR 0080 WBL in Columbia, Pennsylvania has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 0080 WBL inspected?

SR 0080 WBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,651 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 0080 WBL is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 0080 WBL?

SR 0080 WBL has an NBI inventory load rating of 41.7 metric tons.

Who is responsible for maintaining SR 0080 WBL?

SR 0080 WBL is owned and maintained by State Highway Agency.

How old is SR 0080 WBL and does age affect safety?

SR 0080 WBL was built in 1964, making it 62 years old and last reconstructed in 2006.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.