FHWA NBI 2024 Inspection record Public-domain dataset

SR 2104 FOX MINE R

Carrying SR 2104 FOX MINE R over OVER SR 79 NB/SB

JACKSON TOWNSHIP, Mercer, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
36 t Inventory load rating Lower than 54% of rated Pennsylvania bridges

SR 2104 FOX MINE R in Mercer, Pennsylvania sits above 46% of rated Pennsylvania bridges on inventory load rating (36 t), while its 1965 build year is earlier than 57% of Mercer's recorded-year cohort (438 bridges).

SR 2104 FOX MINE R in Mercer, Pennsylvania is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000025751

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · DECK-LED · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 5 spans
  • DECK-LED Deck-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 2104 FOX MINE R

The SR 2104 FOX MINE R bridge in Mercer, Pennsylvania carries SR 2104 FOX MINE R over OVER SR 79 NB/SB. It was built in 1965, making it 61 years old today. It was last reconstructed in 2022, extending its service life. The structure is built primarily of prestressed concrete and spans 5 sections, stretching 69.5 meters (228 feet) end to end. Daily traffic averages 255 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How SR 2104 FOX MINE R compares

▼ 2.1
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
438
Bridges in Mercer · 68 in Poor condition

Age against the county: built in 1965, earlier than 251 of Mercer's 438 bridges with a recorded construction year (57%), against a county median build year of 1966. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 2104 FOX MINE R 36.3 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SR 2104 FOX MINE R vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

36 Top 54% higher than 46% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
36.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Mercer inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 438 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Last Reconstructed
2022
Material
Prestressed Concrete
Number of Spans
5
Structure Length
69.5 m (228 ft)
Deck Width
10.2 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
255 vehicles/day
Structure Number
000000000025751

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

SR 2104 FOX MINE R is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 2104 FOX MINE R against other structures in Mercer and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 2104 FOX MINE R?

SR 2104 FOX MINE R in Mercer, Pennsylvania has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SR 2104 FOX MINE R inspected?

SR 2104 FOX MINE R's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 255 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 2104 FOX MINE R is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 2104 FOX MINE R?

SR 2104 FOX MINE R has an NBI inventory load rating of 36.3 metric tons.

Who is responsible for maintaining SR 2104 FOX MINE R?

SR 2104 FOX MINE R is owned and maintained by State Highway Agency.

How old is SR 2104 FOX MINE R and does age affect safety?

SR 2104 FOX MINE R was built in 1965, making it 61 years old and last reconstructed in 2022.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.