FHWA NBI 2024 Inspection record Public-domain dataset

SR 80 WB

Carrying SR 80 WB over OVER SR 718 SIEG HILL RD

SHENANGO TOWNSHIP, Mercer, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating Lower than 79% of rated Pennsylvania bridges

SR 80 WB in Mercer, Pennsylvania sits above 21% of rated Pennsylvania bridges on inventory load rating (30 t), while its 1964 build year is earlier than 69% of Mercer's recorded-year cohort (438 bridges).

SR 80 WB in Mercer, Pennsylvania is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1964, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000025767

INTERSTATE-ERA · PRESTRESS · MULTI-SPAN · SUB-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 80 WB

The SR 80 WB bridge in Mercer, Pennsylvania carries SR 80 WB over OVER SR 718 SIEG HILL RD. It was built in 1964, making it 62 years old today. It was last reconstructed in 1982, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 32.6 meters (107 feet) end to end. Daily traffic averages 13,487 vehicles, placing it in the heavily-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How SR 80 WB compares

▼ 8.5
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
438
Bridges in Mercer · 68 in Poor condition

Age against the county: built in 1964, earlier than 302 of Mercer's 438 bridges with a recorded construction year (69%), against a county median build year of 1966. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 80 WB 29.9 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SR 80 WB vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

30 Top 79% higher than 21% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Mercer inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 438 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1964
Last Reconstructed
1982
Material
Prestressed Concrete
Number of Spans
3
Structure Length
32.6 m (107 ft)
Deck Width
13.9 m (46 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,487 vehicles/day
Structure Number
000000000025767

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 80 WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 80 WB against other structures in Mercer and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 80 WB?

SR 80 WB in Mercer, Pennsylvania has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 80 WB inspected?

SR 80 WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,487 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 80 WB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 80 WB?

SR 80 WB has an NBI inventory load rating of 29.9 metric tons.

Who is responsible for maintaining SR 80 WB?

SR 80 WB is owned and maintained by State Highway Agency.

How old is SR 80 WB and does age affect safety?

SR 80 WB was built in 1964, making it 62 years old and last reconstructed in 1982.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.