FHWA NBI 2024 Inspection record Public-domain dataset

SR 80 EB

Carrying SR 80 EB over OVER T300 GREENFIELD RD

LACKAWANNOCK TOWNSHIP, Mercer, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
43 t Inventory load rating Higher than 68% of rated Pennsylvania bridges

SR 80 EB in Mercer, Pennsylvania sits above 68% of rated Pennsylvania bridges on inventory load rating (43 t), while its 1965 build year is earlier than 57% of Mercer's recorded-year cohort (438 bridges).

SR 80 EB in Mercer, Pennsylvania is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000025780

INTERSTATE-ERA · PRESTRESS · MULTI-SPAN · SUB-LED · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 80 EB

The SR 80 EB bridge in Mercer, Pennsylvania carries SR 80 EB over OVER T300 GREENFIELD RD. It was built in 1965, making it 61 years old today. It was last reconstructed in 1982, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 27.7 meters (91 feet) end to end. Daily traffic averages 11,198 vehicles, placing it in the heavily-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How SR 80 EB compares

▲ 4.2
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
438
Bridges in Mercer · 68 in Poor condition

Age against the county: built in 1965, earlier than 251 of Mercer's 438 bridges with a recorded construction year (57%), against a county median build year of 1966. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 80 EB 42.6 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SR 80 EB vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

43 Top 32% higher than 68% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Mercer inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 438 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Last Reconstructed
1982
Material
Prestressed Concrete
Number of Spans
3
Structure Length
27.7 m (91 ft)
Deck Width
14.0 m (46 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,198 vehicles/day
Structure Number
000000000025780

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 80 EB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 80 EB against other structures in Mercer and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 80 EB?

SR 80 EB in Mercer, Pennsylvania has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 80 EB inspected?

SR 80 EB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,198 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 80 EB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 80 EB?

SR 80 EB has an NBI inventory load rating of 42.6 metric tons.

Who is responsible for maintaining SR 80 EB?

SR 80 EB is owned and maintained by State Highway Agency.

How old is SR 80 EB and does age affect safety?

SR 80 EB was built in 1965, making it 61 years old and last reconstructed in 1982.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.