FHWA NBI 2024 Inspection record Public-domain dataset

SPRING T822 #760

Carrying SPRING T822 #760 over OVER BEAVER CREEK

2MI SW OF BEAVER SPRINGS, Snyder, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
34 t Inventory load rating Lower than 64% of rated Pennsylvania bridges

SPRING T822 #760 in Snyder, Pennsylvania sits above 36% of rated Pennsylvania bridges on inventory load rating (34 t), while its 1962 build year is earlier than 48% of Snyder's recorded-year cohort (161 bridges).

SPRING T822 #760 in Snyder, Pennsylvania is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1962, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 3. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000031306

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · SUPER-LED · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUPER-LED Superstructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SPRING T822 #760

The SPRING T822 #760 bridge in Snyder, Pennsylvania carries SPRING T822 #760 over OVER BEAVER CREEK. It was built in 1962, making it 64 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.5 meters (51 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 3/9, substructure at 7/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How SPRING T822 #760 compares

▼ 4.8
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
161
Bridges in Snyder · 9 in Poor condition

Age against the county: built in 1962, earlier than 78 of Snyder's 161 bridges with a recorded construction year (48%), against a county median build year of 1962.

SPRING T822 #760 33.6 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

SPRING T822 #760 vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

34 Top 64% higher than 36% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
3/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
33.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Snyder inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 161 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1962
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.5 m (51 ft)
Deck Width
10.8 m (35 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
150 vehicles/day
Structure Number
000000000031306

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates poor at 3/9, with advanced deterioration recorded on the latest inspection.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

SPRING T822 #760 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SPRING T822 #760 against other structures in Snyder and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPRING T822 #760?

SPRING T822 #760 in Snyder, Pennsylvania has a deck rating of 5/9, superstructure rating of 3/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SPRING T822 #760 inspected?

SPRING T822 #760's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPRING T822 #760 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPRING T822 #760?

SPRING T822 #760 has an NBI inventory load rating of 33.6 metric tons.

Who is responsible for maintaining SPRING T822 #760?

SPRING T822 #760 is owned and maintained by Town/Township Highway Agency.

How old is SPRING T822 #760 and does age affect safety?

SPRING T822 #760 was built in 1962, making it 64 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.