FHWA NBI 2024 Inspection record Public-domain dataset

CONNECTOR (SR8079)

Carrying CONNECTOR (SR8079) over I-79 NB&SB & SR9479

TP CONNECTOR OVER I-79, Butler, Pennsylvania

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
36 t Inventory load rating Lower than 54% of rated Pennsylvania bridges

CONNECTOR (SR8079) in Butler, Pennsylvania sits above 46% of rated Pennsylvania bridges on inventory load rating (36 t), while its 2003 build year is earlier than 29% of Butler's recorded-year cohort (378 bridges).

CONNECTOR (SR8079) in Butler, Pennsylvania is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2003, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PA:000000000042191

POST-2000 · PRESTRESS · MULTI-SPAN · SUB-LED · HEAVY-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 2 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CONNECTOR (SR8079)

The CONNECTOR (SR8079) bridge in Butler, Pennsylvania carries CONNECTOR (SR8079) over I-79 NB&SB & SR9479. It was built in 2003, making it 23 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 68.9 meters (226 feet) end to end. Daily traffic averages 11,808 vehicles, placing it in the heavily-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How CONNECTOR (SR8079) compares

▼ 2.1
Load rating vs Pennsylvania average (38.4 t; 23,297 of 23,299 rated)
378
Bridges in Butler · 54 in Poor condition

Age against the county: built in 2003, earlier than 108 of Butler's 378 bridges with a recorded construction year (29%), against a county median build year of 1974. This is one of the newer structures in its county.

CONNECTOR (SR8079) 36.3 t
Pennsylvania average (23,297 of 23,299 rated) 38.4 t

Live comparison across Pennsylvania bridges with a recorded inventory load rating (23,297 of 23,299 rated).

CONNECTOR (SR8079) vs every rated Pennsylvania bridge

Inventory load rating (metric tons), FHWA NBI, this state

36 Top 54% higher than 46% of 23,297 bridges

rated Pennsylvania bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Butler inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 378 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2003
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
68.9 m (226 ft)
Deck Width
18.9 m (62 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,808 vehicles/day
Structure Number
000000000042191

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CONNECTOR (SR8079) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CONNECTOR (SR8079) against other structures in Butler and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CONNECTOR (SR8079)?

CONNECTOR (SR8079) in Butler, Pennsylvania has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CONNECTOR (SR8079) inspected?

CONNECTOR (SR8079)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,808 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CONNECTOR (SR8079) is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CONNECTOR (SR8079)?

CONNECTOR (SR8079) has an NBI inventory load rating of 36.3 metric tons.

Who is responsible for maintaining CONNECTOR (SR8079)?

CONNECTOR (SR8079) is owned and maintained by State Highway Agency.

How old is CONNECTOR (SR8079) and does age affect safety?

CONNECTOR (SR8079) was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.