PR 1 SOUTHBOUND
Carrying PR 1 SOUTHBOUND over SAN ROBERTO STREET
4 KM S W OF RIO PIEDRAS, San Juan, Puerto Rico
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
PR 1 SOUTHBOUND in San Juan, Puerto Rico sits above 23% of rated Puerto Rico bridges on inventory load rating (21 t), while its 1967 build year is earlier than 65% of San Juan's recorded-year cohort (202 bridges).
PR 1 SOUTHBOUND in San Juan, Puerto Rico is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1967, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure PR:009542
INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-POOR
- INTERSTATE-ERA 1950–1979
- CONCRETE Concrete
- MULTI-SPAN 3 spans
- TIED-CTRL Tied control
- HEAVY-ADT Heavy ADT
- STANDARD-LOAD Standard load
- CAT-POOR Poor
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Structural health score
A composite of the deck, superstructure, and substructure NBI condition ratings plus the inventory load rating, benchmarked against the full national bridge corpus, distinct from the Good/Fair/Poor category above.
Bridge Snapshot: PR 1 SOUTHBOUND
The PR 1 SOUTHBOUND bridge in San Juan, Puerto Rico carries PR 1 SOUTHBOUND over SAN ROBERTO STREET. It was built in 1967, making it 59 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 51.7 meters (170 feet) end to end. Daily traffic averages 45,500 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection places the weakest component in poor condition (see the full component ratings below). Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.
How PR 1 SOUTHBOUND compares
Age against the county: built in 1967, earlier than 131 of San Juan's 202 bridges with a recorded construction year (65%), against a county median build year of 1977. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across Puerto Rico bridges with a recorded inventory load rating (2,385 rated).
PR 1 SOUTHBOUND vs every rated Puerto Rico bridge
Inventory load rating (metric tons), FHWA NBI, this state
21 Top 77% higher than 23% of 2,385 bridges
rated Puerto Rico bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
San Juan inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 202 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 1967
- Material
- Concrete Continuous
- Number of Spans
- 3
- Structure Length
- 51.7 m (170 ft)
- Deck Width
- 13.3 m (44 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 45,500 vehicles/day
- Structure Number
- 009542
Condition Analysis
- • The deck (driving surface) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
- • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
- • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
PR 1 SOUTHBOUND is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare PR 1 SOUTHBOUND against other structures in San Juan and across Puerto Rico. Puerto Rico bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for PR 1 SOUTHBOUND?
PR 1 SOUTHBOUND in San Juan, Puerto Rico has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.
How often is PR 1 SOUTHBOUND inspected?
PR 1 SOUTHBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 45,500 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. PR 1 SOUTHBOUND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for PR 1 SOUTHBOUND?
PR 1 SOUTHBOUND has an NBI inventory load rating of 21.2 metric tons.
Who is responsible for maintaining PR 1 SOUTHBOUND?
PR 1 SOUTHBOUND is owned and maintained by State Highway Agency.
How old is PR 1 SOUTHBOUND and does age affect safety?
PR 1 SOUTHBOUND was built in 1967, making it 59 years old.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.