FHWA NBI 2024 Inspection record Public-domain dataset

PR 200R

Carrying PR 200R over WATERWAY

IN ISABEL II VIEQUES, Vieques, Puerto Rico

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating Lower than 63% of rated Puerto Rico bridges

PR 200R in Vieques, Puerto Rico sits above 37% of rated Puerto Rico bridges on inventory load rating (29 t), while its 1930 build year is earlier than 85% of Vieques's recorded-year cohort (13 bridges).

PR 200R in Vieques, Puerto Rico is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1930, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PR:010871

PRE-1950 · CONCRETE · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Structural health score

A composite of the deck, superstructure, and substructure NBI condition ratings plus the inventory load rating, benchmarked against the full national bridge corpus, distinct from the Good/Fair/Poor category above.

F
Overall Score
21/100
PR 200R
Deck Condition F
5/9
NBI deck condition rating (0=failed, 9=excellent)
Superstructure Condition F
5/9
NBI superstructure condition rating (0=failed, 9=excellent)
Substructure Condition F
6/9
NBI substructure condition rating (0=failed, 9=excellent)
Load Rating F
29 t
NBI inventory load rating vs the national corpus

Bridge Snapshot: PR 200R

The PR 200R bridge in Vieques, Puerto Rico carries PR 200R over WATERWAY. It was built in 1930, making it 96 years old today. It was last reconstructed in 1965, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 15.6 meters (51 feet) end to end. Daily traffic averages 10,300 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection places the weakest component in fair condition (see the full component ratings below). None of this bridge's reported major components fall into the Poor condition range.

How PR 200R compares

▼ 8.4
Load rating vs Puerto Rico average (37.8 t; 2,385 rated)
13
Bridges in Vieques · 2 in Poor condition

Age against the county: built in 1930, earlier than 11 of Vieques's 13 bridges with a recorded construction year (85%), against a county median build year of 2009. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

PR 200R 29.4 t
Puerto Rico average (2,385 rated) 37.8 t

Live comparison across Puerto Rico bridges with a recorded inventory load rating (2,385 rated).

PR 200R vs every rated Puerto Rico bridge

Inventory load rating (metric tons), FHWA NBI, this state

29 Top 63% higher than 37% of 2,385 bridges

rated Puerto Rico bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Vieques inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 13 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1930
Last Reconstructed
1965
Material
Concrete
Number of Spans
1
Structure Length
15.6 m (51 ft)
Deck Width
9.5 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,300 vehicles/day
Structure Number
010871

Condition Analysis

  • • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether PR 200R is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PR 200R against other structures in Vieques and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 200R?

PR 200R in Vieques, Puerto Rico has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PR 200R inspected?

PR 200R's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 200R is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 200R?

PR 200R has an NBI inventory load rating of 29.4 metric tons.

Who is responsible for maintaining PR 200R?

PR 200R is owned and maintained by State Highway Agency.

How old is PR 200R and does age affect safety?

PR 200R was built in 1930, making it 96 years old and last reconstructed in 1965.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.