FHWA NBI 2024 Inspection record Public-domain dataset

PR 22 WESTBOUND

Carrying PR 22 WESTBOUND over BAYAMON & HONDO RIVE

4.5 KM NORTH OF BAYAMON, Cataño, Puerto Rico

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
46 t Inventory load rating Higher than 67% of rated Puerto Rico bridges

PR 22 WESTBOUND in Cataño, Puerto Rico sits above 67% of rated Puerto Rico bridges on inventory load rating (46 t), while its 1976 build year is earlier than 13% of Cataño's recorded-year cohort (16 bridges).

PR 22 WESTBOUND in Cataño, Puerto Rico is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1976, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PR:020011

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · SUPER-LED · HEAVY-ADT · HEAVY-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 6 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PR 22 WESTBOUND

The PR 22 WESTBOUND bridge in Cataño, Puerto Rico carries PR 22 WESTBOUND over BAYAMON & HONDO RIVE. It was built in 1976, making it 50 years old today. It was last reconstructed in 1988, extending its service life. The structure is built primarily of prestressed concrete and spans 6 sections, stretching 438.4 meters (1438 feet) end to end. Daily traffic averages 100,600 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How PR 22 WESTBOUND compares

▲ 8.2
Load rating vs Puerto Rico average (37.8 t; 2,385 rated)
16
Bridges in Cataño · 2 in Poor condition

Age against the county: built in 1976, earlier than 2 of Cataño's 16 bridges with a recorded construction year (13%), against a county median build year of 1971. This is one of the newer structures in its county.

PR 22 WESTBOUND 46.0 t
Puerto Rico average (2,385 rated) 37.8 t

Live comparison across Puerto Rico bridges with a recorded inventory load rating (2,385 rated).

PR 22 WESTBOUND vs every rated Puerto Rico bridge

Inventory load rating (metric tons), FHWA NBI, this state

46 Top 33% higher than 67% of 2,385 bridges

rated Puerto Rico bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
46.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Cataño inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 16 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1976
Last Reconstructed
1988
Material
Prestressed Concrete
Number of Spans
6
Structure Length
438.4 m (1438 ft)
Deck Width
36.0 m (118 ft)
Owner
State Toll Authority
Avg Daily Traffic
100,600 vehicles/day
Structure Number
020011

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

PR 22 WESTBOUND is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 22 WESTBOUND against other structures in Cataño and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 22 WESTBOUND?

PR 22 WESTBOUND in Cataño, Puerto Rico has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PR 22 WESTBOUND inspected?

PR 22 WESTBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100,600 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 22 WESTBOUND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 22 WESTBOUND?

PR 22 WESTBOUND has an NBI inventory load rating of 46.0 metric tons.

Who is responsible for maintaining PR 22 WESTBOUND?

PR 22 WESTBOUND is owned and maintained by State Toll Authority.

How old is PR 22 WESTBOUND and does age affect safety?

PR 22 WESTBOUND was built in 1976, making it 50 years old and last reconstructed in 1988.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.