FHWA NBI 2024 Inspection record Public-domain dataset

PR 37

Carrying PR 37 over PR 26

100 MT NE MINILLAS CENTER, San Juan, Puerto Rico

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
46 t Inventory load rating Higher than 67% of rated Puerto Rico bridges

PR 37 in San Juan, Puerto Rico sits above 67% of rated Puerto Rico bridges on inventory load rating (46 t), while its 1979 build year is earlier than 36% of San Juan's recorded-year cohort (202 bridges).

PR 37 in San Juan, Puerto Rico is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PR:020801

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Structural health score

A composite of the deck, superstructure, and substructure NBI condition ratings plus the inventory load rating, benchmarked against the full national bridge corpus, distinct from the Good/Fair/Poor category above.

F
Overall Score
37/100
PR 37
Deck Condition F
4/9
NBI deck condition rating (0=failed, 9=excellent)
Superstructure Condition F
4/9
NBI superstructure condition rating (0=failed, 9=excellent)
Substructure Condition C-
7/9
NBI substructure condition rating (0=failed, 9=excellent)
Load Rating A-
46 t
NBI inventory load rating vs the national corpus

Bridge Snapshot: PR 37

The PR 37 bridge in San Juan, Puerto Rico carries PR 37 over PR 26. It was built in 1979, making it 47 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 37.8 meters (124 feet) end to end. Daily traffic averages 20,500 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection places the weakest component in poor condition (see the full component ratings below). A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How PR 37 compares

▲ 8.2
Load rating vs Puerto Rico average (37.8 t; 2,385 rated)
202
Bridges in San Juan · 19 in Poor condition

Age against the county: built in 1979, earlier than 72 of San Juan's 202 bridges with a recorded construction year (36%), against a county median build year of 1977. This is one of the newer structures in its county.

PR 37 46.0 t
Puerto Rico average (2,385 rated) 37.8 t

Live comparison across Puerto Rico bridges with a recorded inventory load rating (2,385 rated).

PR 37 vs every rated Puerto Rico bridge

Inventory load rating (metric tons), FHWA NBI, this state

46 Top 33% higher than 67% of 2,385 bridges

rated Puerto Rico bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
46.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

San Juan inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 202 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Material
Concrete
Number of Spans
2
Structure Length
37.8 m (124 ft)
Deck Width
31.8 m (104 ft)
Owner
State Highway Agency
Avg Daily Traffic
20,500 vehicles/day
Structure Number
020801

Condition Analysis

  • • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

PR 37 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 37 against other structures in San Juan and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 37?

PR 37 in San Juan, Puerto Rico has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PR 37 inspected?

PR 37's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 37 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 37?

PR 37 has an NBI inventory load rating of 46.0 metric tons.

Who is responsible for maintaining PR 37?

PR 37 is owned and maintained by State Highway Agency.

How old is PR 37 and does age affect safety?

PR 37 was built in 1979, making it 47 years old.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.