FHWA NBI 2024 Inspection record Public-domain dataset

PR 2 EASTBOUND

Carrying PR 2 EASTBOUND over PR 127

6 KM EAST OF GUAYANILLA, Peñuelas, Puerto Rico

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
42 t Inventory load rating Higher than 61% of rated Puerto Rico bridges

PR 2 EASTBOUND in Peñuelas, Puerto Rico sits above 61% of rated Puerto Rico bridges on inventory load rating (42 t), while its 1991 build year is earlier than 28% of Peñuelas's recorded-year cohort (25 bridges).

PR 2 EASTBOUND in Peñuelas, Puerto Rico is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1991, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure PR:022472

LATE-CENTURY · CONCRETE · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PR 2 EASTBOUND

The PR 2 EASTBOUND bridge in Peñuelas, Puerto Rico carries PR 2 EASTBOUND over PR 127. It was built in 1991, making it 35 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 31.3 meters (103 feet) end to end. Daily traffic averages 33,400 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How PR 2 EASTBOUND compares

▲ 4.6
Load rating vs Puerto Rico average (37.8 t; 2,385 rated)
25
Bridges in Peñuelas · 3 in Poor condition

Age against the county: built in 1991, earlier than 7 of Peñuelas's 25 bridges with a recorded construction year (28%), against a county median build year of 1969. This is one of the newer structures in its county.

PR 2 EASTBOUND 42.4 t
Puerto Rico average (2,385 rated) 37.8 t

Live comparison across Puerto Rico bridges with a recorded inventory load rating (2,385 rated).

PR 2 EASTBOUND vs every rated Puerto Rico bridge

Inventory load rating (metric tons), FHWA NBI, this state

42 Top 39% higher than 61% of 2,385 bridges

rated Puerto Rico bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Peñuelas inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 25 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1991
Material
Concrete
Number of Spans
3
Structure Length
31.3 m (103 ft)
Deck Width
13.7 m (45 ft)
Owner
State Highway Agency
Avg Daily Traffic
33,400 vehicles/day
Structure Number
022472

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether PR 2 EASTBOUND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PR 2 EASTBOUND against other structures in Peñuelas and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 2 EASTBOUND?

PR 2 EASTBOUND in Peñuelas, Puerto Rico has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PR 2 EASTBOUND inspected?

PR 2 EASTBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 33,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 2 EASTBOUND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 2 EASTBOUND?

PR 2 EASTBOUND has an NBI inventory load rating of 42.4 metric tons.

Who is responsible for maintaining PR 2 EASTBOUND?

PR 2 EASTBOUND is owned and maintained by State Highway Agency.

How old is PR 2 EASTBOUND and does age affect safety?

PR 2 EASTBOUND was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.