FHWA NBI 2024 Inspection record Public-domain dataset

UT 145

Carrying UT 145 over CROSS RIVER

0.1 MI E OF JCT TH 65, Koochiching, Minnesota

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: UT 145

The UT 145 bridge in Koochiching, Minnesota carries UT 145 over CROSS RIVER. It was built in 1986, making it 40 years old today. The structure is built primarily of steel and spans 2 sections, stretching 18.7 meters (61 feet) end to end. Daily traffic averages 1 vehicles, placing it in the lower-traffic tier of Minnesota bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 13.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How UT 145 compares

▼ 22.1
Load rating vs Minnesota average (35.7 t)
Bottom 1%
Lower load rating than 99% of Minnesota bridges
53
Bridges in Koochiching · 3 in Poor condition
UT 145 13.6 t
Minnesota average 35.7 t

Live comparison across Minnesota.

Historical Sufficiency Rating

PlainBridge-computed
63.5 / 100 - historical 50–79.9 band
Structural adequacy /55
28.5
Serviceability /30
25.0
Essentiality /15
15.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1986
Material
Steel
Number of Spans
2
Structure Length
18.7 m (61 ft)
Deck Width
6.2 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
1 vehicles/day
Structure Number
R0099

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether UT 145 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare UT 145 against other structures in Koochiching and across Minnesota. Minnesota bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for UT 145?

UT 145 in Koochiching, Minnesota has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is UT 145 inspected?

UT 145's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. UT 145 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for UT 145?

UT 145 has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining UT 145?

UT 145 is owned and maintained by County Highway Agency.

How old is UT 145 and does age affect safety?

UT 145 was built in 1986, making it 40 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.