FHWA NBI 2024 Inspection record Public-domain dataset

N67

Carrying N67 over STREAM

2W BROCK, Nemaha, Nebraska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating

Bridge Snapshot: N67

The N67 bridge in Nemaha, Nebraska carries N67 over STREAM. It was built in 1965, making it 61 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.6 meters (71 feet) end to end. Daily traffic averages 340 vehicles, placing it in the lower-traffic tier of Nebraska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 40.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How N67 compares

▲ 12.3
Load rating vs Nebraska average (27.7 t)
Top 14%
Higher load rating than 86% of Nebraska bridges
179
Bridges in Nemaha · 65 in Poor condition
N67 40.0 t
Nebraska average 27.7 t

Live comparison across Nebraska.

Historical Sufficiency Rating

PlainBridge-computed
99.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
40.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Last Reconstructed
1991
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.6 m (71 ft)
Deck Width
11.7 m (38 ft)
Owner
State Highway Agency
Avg Daily Traffic
340 vehicles/day
Structure Number
S067 04304

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether N67 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare N67 against other structures in Nemaha and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for N67?

N67 in Nemaha, Nebraska has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is N67 inspected?

N67's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 340 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. N67 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for N67?

N67 has an NBI inventory load rating of 40.0 metric tons.

Who is responsible for maintaining N67?

N67 is owned and maintained by State Highway Agency.

How old is N67 and does age affect safety?

N67 was built in 1965, making it 61 years old and last reconstructed in 1991.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.