FHWA NBI 2024 Inspection record Public-domain dataset

I80

Carrying I80 over M CH PLATTE RIVER

1W HASTINGS INTRCHG, Hall, Nebraska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating

Bridge Snapshot: I80

The I80 bridge in Hall, Nebraska carries I80 over M CH PLATTE RIVER. It was built in 1961, making it 65 years old today. It was last reconstructed in 1990, extending its service life. The structure is built primarily of prestressed concrete and spans 2 sections, stretching 43.9 meters (144 feet) end to end. Daily traffic averages 22,930 vehicles, placing it in the heavily-trafficked tier of Nebraska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 40.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I80 compares

▲ 12.3
Load rating vs Nebraska average (27.7 t)
Top 14%
Higher load rating than 86% of Nebraska bridges
279
Bridges in Hall · 10 in Poor condition
I80 40.0 t
Nebraska average 27.7 t

Live comparison across Nebraska.

Historical Sufficiency Rating

PlainBridge-computed
85.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
40.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1961
Last Reconstructed
1990
Material
Prestressed Concrete
Number of Spans
2
Structure Length
43.9 m (144 ft)
Deck Width
13.5 m (44 ft)
Owner
State Highway Agency
Avg Daily Traffic
22,930 vehicles/day
Structure Number
S080 31128L

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether I80 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I80 against other structures in Hall and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I80?

I80 in Hall, Nebraska has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I80 inspected?

I80's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22,930 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I80 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I80?

I80 has an NBI inventory load rating of 40.0 metric tons.

Who is responsible for maintaining I80?

I80 is owned and maintained by State Highway Agency.

How old is I80 and does age affect safety?

I80 was built in 1961, making it 65 years old and last reconstructed in 1990.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.