FHWA NBI 2024 Inspection record Public-domain dataset

WB-CD

Carrying WB-CD over UPRR 815-672-J

IN OMAHA, Douglas, Nebraska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating

Bridge Snapshot: WB-CD

The WB-CD bridge in Douglas, Nebraska carries WB-CD over UPRR 815-672-J. It was built in 1988, making it 38 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 64.3 meters (211 feet) end to end. Daily traffic averages 150,360 vehicles, placing it in the heavily-trafficked tier of Nebraska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 39.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WB-CD compares

▲ 11.3
Load rating vs Nebraska average (27.7 t)
Top 16%
Higher load rating than 84% of Nebraska bridges
563
Bridges in Douglas · 10 in Poor condition
WB-CD 39.0 t
Nebraska average 27.7 t

Live comparison across Nebraska.

Historical Sufficiency Rating

PlainBridge-computed
70.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
15.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Steel Continuous
Number of Spans
3
Structure Length
64.3 m (211 ft)
Deck Width
18.0 m (59 ft)
Owner
State Highway Agency
Avg Daily Traffic
150,360 vehicles/day
Structure Number
S080 44572

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether WB-CD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WB-CD against other structures in Douglas and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WB-CD?

WB-CD in Douglas, Nebraska has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is WB-CD inspected?

WB-CD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150,360 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WB-CD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WB-CD?

WB-CD has an NBI inventory load rating of 39.0 metric tons.

Who is responsible for maintaining WB-CD?

WB-CD is owned and maintained by State Highway Agency.

How old is WB-CD and does age affect safety?

WB-CD was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.