FHWA NBI 2024 Inspection record Public-domain dataset

PEMBLE ROAD

Carrying PEMBLE ROAD over BCH OF BOGUE PHALIA CK

SEC 18 T23N R 6W B, Bolivar, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
5 t Inventory load rating

Bridge Snapshot: PEMBLE ROAD

The PEMBLE ROAD bridge in Bolivar, Mississippi carries PEMBLE ROAD over BCH OF BOGUE PHALIA CK. It was built in 1971, making it 55 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 11.6 meters (38 feet) end to end. Daily traffic averages 80 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 5.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PEMBLE ROAD compares

▼ 29.4
Load rating vs Mississippi average (34.4 t)
Bottom 1%
Lower load rating than 99% of Mississippi bridges
272
Bridges in Bolivar · 22 in Poor condition
PEMBLE ROAD 5.0 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
40.9 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
26.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
5.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Concrete
Number of Spans
2
Structure Length
11.6 m (38 ft)
Deck Width
8.6 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
80 vehicles/day
Structure Number
SA0600000000154

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

PEMBLE ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PEMBLE ROAD against other structures in Bolivar and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PEMBLE ROAD?

PEMBLE ROAD in Bolivar, Mississippi has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PEMBLE ROAD inspected?

PEMBLE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 80 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PEMBLE ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PEMBLE ROAD?

PEMBLE ROAD has an NBI inventory load rating of 5.0 metric tons.

Who is responsible for maintaining PEMBLE ROAD?

PEMBLE ROAD is owned and maintained by County Highway Agency.

How old is PEMBLE ROAD and does age affect safety?

PEMBLE ROAD was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.