FHWA NBI 2024 Inspection record Public-domain dataset

GREEN TEE ROAD

Carrying GREEN TEE ROAD over BARLEY LAKE BRANCH

SEC 14 T10S R 5E, Lee, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
17 t Inventory load rating

Bridge Snapshot: GREEN TEE ROAD

The GREEN TEE ROAD bridge in Lee, Mississippi carries GREEN TEE ROAD over BARLEY LAKE BRANCH. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 99 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 17.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GREEN TEE ROAD compares

▼ 17.1
Load rating vs Mississippi average (34.4 t)
Bottom 8%
Lower load rating than 92% of Mississippi bridges
393
Bridges in Lee · 17 in Poor condition
GREEN TEE ROAD 17.3 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
53.8 / 100 - historical 50–79.9 band
Structural adequacy /55
10.9
Serviceability /30
28.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
17.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
9.5 m (31 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
99 vehicles/day
Structure Number
SA4100000000124

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

GREEN TEE ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare GREEN TEE ROAD against other structures in Lee and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GREEN TEE ROAD?

GREEN TEE ROAD in Lee, Mississippi has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is GREEN TEE ROAD inspected?

GREEN TEE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 99 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GREEN TEE ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GREEN TEE ROAD?

GREEN TEE ROAD has an NBI inventory load rating of 17.3 metric tons.

Who is responsible for maintaining GREEN TEE ROAD?

GREEN TEE ROAD is owned and maintained by City/Municipal Highway Agency.

How old is GREEN TEE ROAD and does age affect safety?

GREEN TEE ROAD was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.