FHWA NBI 2024 Inspection record Public-domain dataset

JACKSON LIB.DR. NW

Carrying JACKSON LIB.DR. NW over SHAWS CREEK

SEC 12 T 7N R 6E B, Lincoln, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
20 t Inventory load rating

Bridge Snapshot: JACKSON LIB.DR. NW

The JACKSON LIB.DR. NW bridge in Lincoln, Mississippi carries JACKSON LIB.DR. NW over SHAWS CREEK. It was built in 1967, making it 59 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 48.8 meters (160 feet) end to end. Daily traffic averages 680 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 19.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How JACKSON LIB.DR. NW compares

▼ 14.8
Load rating vs Mississippi average (34.4 t)
Bottom 10%
Lower load rating than 90% of Mississippi bridges
380
Bridges in Lincoln · 41 in Poor condition
JACKSON LIB.DR. NW 19.6 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
73.8 / 100 - historical 50–79.9 band
Structural adequacy /55
40.1
Serviceability /30
22.2
Essentiality /15
14.5
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Prestressed Concrete
Number of Spans
4
Structure Length
48.8 m (160 ft)
Deck Width
9.1 m (30 ft)
Owner
County Highway Agency
Avg Daily Traffic
680 vehicles/day
Structure Number
SA4300000000157

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether JACKSON LIB.DR. NW is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare JACKSON LIB.DR. NW against other structures in Lincoln and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for JACKSON LIB.DR. NW?

JACKSON LIB.DR. NW in Lincoln, Mississippi has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is JACKSON LIB.DR. NW inspected?

JACKSON LIB.DR. NW's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 680 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. JACKSON LIB.DR. NW is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for JACKSON LIB.DR. NW?

JACKSON LIB.DR. NW has an NBI inventory load rating of 19.6 metric tons.

Who is responsible for maintaining JACKSON LIB.DR. NW?

JACKSON LIB.DR. NW is owned and maintained by County Highway Agency.

How old is JACKSON LIB.DR. NW and does age affect safety?

JACKSON LIB.DR. NW was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.