FHWA NBI 2024 Inspection record Public-domain dataset

FIRST HOPEWELL RD

Carrying FIRST HOPEWELL RD over UPPER LITTLE RIVER

SEC 1 T 4N R17W, Marion, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
36 t Inventory load rating

Bridge Snapshot: FIRST HOPEWELL RD

The FIRST HOPEWELL RD bridge in Marion, Mississippi carries FIRST HOPEWELL RD over UPPER LITTLE RIVER. It was built in 2019, making it 7 years old today. The structure is built primarily of concrete and spans 5 sections, stretching 32.6 meters (107 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 35.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FIRST HOPEWELL RD compares

▲ 1.2
Load rating vs Mississippi average (34.4 t)
Top 38%
Higher load rating than 62% of Mississippi bridges
201
Bridges in Marion · 10 in Poor condition
FIRST HOPEWELL RD 35.6 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
88.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
21.5
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
35.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2019
Material
Concrete
Number of Spans
5
Structure Length
32.6 m (107 ft)
Deck Width
7.5 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
SA460000000A095

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FIRST HOPEWELL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FIRST HOPEWELL RD against other structures in Marion and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FIRST HOPEWELL RD?

FIRST HOPEWELL RD in Marion, Mississippi has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FIRST HOPEWELL RD inspected?

FIRST HOPEWELL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FIRST HOPEWELL RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FIRST HOPEWELL RD?

FIRST HOPEWELL RD has an NBI inventory load rating of 35.6 metric tons.

Who is responsible for maintaining FIRST HOPEWELL RD?

FIRST HOPEWELL RD is owned and maintained by County Highway Agency.

How old is FIRST HOPEWELL RD and does age affect safety?

FIRST HOPEWELL RD was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.