FHWA NBI 2024 Inspection record Public-domain dataset

MCNEIL ROAD

Carrying MCNEIL ROAD over TALLASHER CREEK

SEC 29 T 7N R13E, Newton, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
28 t Inventory load rating

Bridge Snapshot: MCNEIL ROAD

The MCNEIL ROAD bridge in Newton, Mississippi carries MCNEIL ROAD over TALLASHER CREEK. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 54.9 meters (180 feet) end to end. Daily traffic averages 70 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 27.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MCNEIL ROAD compares

▼ 6.6
Load rating vs Mississippi average (34.4 t)
Bottom 27%
Lower load rating than 73% of Mississippi bridges
244
Bridges in Newton · 12 in Poor condition
MCNEIL ROAD 27.8 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
96.7 / 100 - historical 80–100 band
Structural adequacy /55
51.8
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Prestressed Concrete
Number of Spans
3
Structure Length
54.9 m (180 ft)
Deck Width
9.5 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
70 vehicles/day
Structure Number
SA5100000000110

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether MCNEIL ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MCNEIL ROAD against other structures in Newton and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MCNEIL ROAD?

MCNEIL ROAD in Newton, Mississippi has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MCNEIL ROAD inspected?

MCNEIL ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 70 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MCNEIL ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MCNEIL ROAD?

MCNEIL ROAD has an NBI inventory load rating of 27.8 metric tons.

Who is responsible for maintaining MCNEIL ROAD?

MCNEIL ROAD is owned and maintained by County Highway Agency.

How old is MCNEIL ROAD and does age affect safety?

MCNEIL ROAD was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.