LAKE FOREST RANCH
Carrying LAKE FOREST RANCH over SUN CREEK
SEC 30 T15N R15E, Noxubee, Mississippi
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: LAKE FOREST RANCH
The LAKE FOREST RANCH bridge in Noxubee, Mississippi carries LAKE FOREST RANCH over SUN CREEK. It was built in 2001, making it 25 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 6.7 meters (22 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 46.4 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How LAKE FOREST RANCH compares
Live comparison across Mississippi.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2001
- Material
- Concrete
- Number of Spans
- 2
- Structure Length
- 6.7 m (22 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 100 vehicles/day
- Structure Number
- SA5200000000067
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether LAKE FOREST RANCH is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare LAKE FOREST RANCH against other structures in Noxubee and across Mississippi. Mississippi bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for LAKE FOREST RANCH?
LAKE FOREST RANCH in Noxubee, Mississippi on the FHWA's 0–9 scale.
How often is LAKE FOREST RANCH inspected?
LAKE FOREST RANCH's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. LAKE FOREST RANCH is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for LAKE FOREST RANCH?
LAKE FOREST RANCH has an NBI inventory load rating of 46.4 metric tons.
Who is responsible for maintaining LAKE FOREST RANCH?
LAKE FOREST RANCH is owned and maintained by County Highway Agency.
How old is LAKE FOREST RANCH and does age affect safety?
LAKE FOREST RANCH was built in 2001, making it 25 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.