FHWA NBI 2024 Inspection record Public-domain dataset

SC 11

Carrying SC 11 over GVILLE WATER WORKS PIPES

14MI NE OF PICKENS, Pickens, South Carolina

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
35 t Inventory load rating Higher than 66% of rated South Carolina bridges

SC 11 in Pickens, South Carolina sits above 66% of rated South Carolina bridges on inventory load rating (35 t), while its 1970 build year is earlier than 53% of Pickens's recorded-year cohort (291 bridges).

SC 11 in Pickens, South Carolina is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1970, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure SC:000000000005838

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · SUB-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SC 11

The SC 11 bridge in Pickens, South Carolina carries SC 11 over GVILLE WATER WORKS PIPES. It was built in 1970, making it 56 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 54.9 meters (180 feet) end to end. Daily traffic averages 3,300 vehicles, placing it in the moderately-trafficked tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How SC 11 compares

▲ 5.0
Load rating vs South Carolina average (30.3 t; 9,483 of 9,490 rated)
291
Bridges in Pickens · 27 in Poor condition

Age against the county: built in 1970, earlier than 153 of Pickens's 291 bridges with a recorded construction year (53%), against a county median build year of 1977. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SC 11 35.3 t
South Carolina average (9,483 of 9,490 rated) 30.3 t

Live comparison across South Carolina bridges with a recorded inventory load rating (9,483 of 9,490 rated).

SC 11 vs every rated South Carolina bridge

Inventory load rating (metric tons), FHWA NBI, this state

35 Top 34% higher than 66% of 9,483 bridges

rated South Carolina bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
35.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Pickens inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 291 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1970
Material
Prestressed Concrete
Number of Spans
4
Structure Length
54.9 m (180 ft)
Deck Width
14.5 m (48 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,300 vehicles/day
Structure Number
000000000005838

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.

How to read this record

SC 11 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SC 11 against other structures in Pickens and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SC 11?

SC 11 in Pickens, South Carolina has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is SC 11 inspected?

SC 11's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SC 11 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SC 11?

SC 11 has an NBI inventory load rating of 35.3 metric tons.

Who is responsible for maintaining SC 11?

SC 11 is owned and maintained by State Highway Agency.

How old is SC 11 and does age affect safety?

SC 11 was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.