FHWA NBI 2024 Inspection record Public-domain dataset

S-21-356

Carrying S-21-356 over HIGH HILL CREEK

7MI SE DARLINGTON, Florence, South Carolina

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
23 t Inventory load rating Lower than 70% of rated South Carolina bridges

S-21-356 in Florence, South Carolina sits above 30% of rated South Carolina bridges on inventory load rating (23 t), while its 1984 build year is earlier than 38% of Florence's recorded-year cohort (277 bridges).

S-21-356 in Florence, South Carolina is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1984, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure SC:000000000007774

LATE-CENTURY · CONCRETE · LONG-SPAN-RUN · SUB-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • LONG-SPAN-RUN 7 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: S-21-356

The S-21-356 bridge in Florence, South Carolina carries S-21-356 over HIGH HILL CREEK. It was built in 1984, making it 42 years old today. The structure is built primarily of concrete and spans 7 sections, stretching 32.0 meters (105 feet) end to end. Daily traffic averages 5,800 vehicles, placing it in the moderately-trafficked tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How S-21-356 compares

▼ 7.6
Load rating vs South Carolina average (30.3 t; 9,483 of 9,490 rated)
277
Bridges in Florence · 7 in Poor condition

Age against the county: built in 1984, earlier than 105 of Florence's 277 bridges with a recorded construction year (38%), against a county median build year of 1973. This is one of the newer structures in its county.

S-21-356 22.7 t
South Carolina average (9,483 of 9,490 rated) 30.3 t

Live comparison across South Carolina bridges with a recorded inventory load rating (9,483 of 9,490 rated).

S-21-356 vs every rated South Carolina bridge

Inventory load rating (metric tons), FHWA NBI, this state

23 Top 70% higher than 30% of 9,483 bridges

rated South Carolina bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Florence inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 277 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1984
Material
Concrete
Number of Spans
7
Structure Length
32.0 m (105 ft)
Deck Width
10.1 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,800 vehicles/day
Structure Number
000000000007774

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.

How to read this record

S-21-356 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare S-21-356 against other structures in Florence and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S-21-356?

S-21-356 in Florence, South Carolina has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is S-21-356 inspected?

S-21-356's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S-21-356 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S-21-356?

S-21-356 has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining S-21-356?

S-21-356 is owned and maintained by State Highway Agency.

How old is S-21-356 and does age affect safety?

S-21-356 was built in 1984, making it 42 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.