FHWA NBI 2024 Inspection record Public-domain dataset

S-31-313

Carrying S-31-313 over BEAVER DAM CK (1)

10 MI SW BISHOPVILLE, Lee, South Carolina

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
51 t Inventory load rating Higher than 95% of rated South Carolina bridges

S-31-313 in Lee, South Carolina sits above 95% of rated South Carolina bridges on inventory load rating (51 t), while its 2020 build year is earlier than 1% of Lee's recorded-year cohort (91 bridges).

S-31-313 in Lee, South Carolina is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2020, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure SC:000000000010316

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: S-31-313

The S-31-313 bridge in Lee, South Carolina carries S-31-313 over BEAVER DAM CK (1). It was built in 2020, making it 6 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.3 meters (70 feet) end to end. Daily traffic averages 300 vehicles, placing it in the lower-traffic tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How S-31-313 compares

▲ 20.2
Load rating vs South Carolina average (30.3 t; 9,483 of 9,490 rated)
91
Bridges in Lee · 2 in Poor condition

Age against the county: built in 2020, earlier than 1 of Lee's 91 bridges with a recorded construction year (1%), against a county median build year of 1972. This is one of the newer structures in its county.

S-31-313 50.5 t
South Carolina average (9,483 of 9,490 rated) 30.3 t

Live comparison across South Carolina bridges with a recorded inventory load rating (9,483 of 9,490 rated).

S-31-313 vs every rated South Carolina bridge

Inventory load rating (metric tons), FHWA NBI, this state

51 Top 5% higher than 95% of 9,483 bridges

rated South Carolina bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
50.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lee inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 91 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2020
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.3 m (70 ft)
Deck Width
11.0 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
300 vehicles/day
Structure Number
000000000010316

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether S-31-313 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare S-31-313 against other structures in Lee and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S-31-313?

S-31-313 in Lee, South Carolina has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is S-31-313 inspected?

S-31-313's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S-31-313 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S-31-313?

S-31-313 has an NBI inventory load rating of 50.5 metric tons.

Who is responsible for maintaining S-31-313?

S-31-313 is owned and maintained by State Highway Agency.

How old is S-31-313 and does age affect safety?

S-31-313 was built in 2020, making it 6 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.