FHWA NBI 2024 Inspection record Public-domain dataset

BULLHEAD RUN BRANC

Carrying BULLHEAD RUN BRANC over BRANCH

NO DATA ENTERED, Berkeley, South Carolina

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
20 t Inventory load rating Lower than 75% of rated South Carolina bridges

BULLHEAD RUN BRANC in Berkeley, South Carolina sits above 25% of rated South Carolina bridges on inventory load rating (20 t), while its 1979 build year is earlier than 44% of Berkeley's recorded-year cohort (216 bridges).

BULLHEAD RUN BRANC in Berkeley, South Carolina is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure SC:081206000003150

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · SUB-LED · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BULLHEAD RUN BRANC

The BULLHEAD RUN BRANC bridge in Berkeley, South Carolina carries BULLHEAD RUN BRANC over BRANCH. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of South Carolina bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How BULLHEAD RUN BRANC compares

▼ 10.2
Load rating vs South Carolina average (30.3 t; 9,483 of 9,490 rated)
216
Bridges in Berkeley · 5 in Poor condition

Age against the county: built in 1979, earlier than 94 of Berkeley's 216 bridges with a recorded construction year (44%), against a county median build year of 1974. This is one of the newer structures in its county.

BULLHEAD RUN BRANC 20.1 t
South Carolina average (9,483 of 9,490 rated) 30.3 t

Live comparison across South Carolina bridges with a recorded inventory load rating (9,483 of 9,490 rated).

BULLHEAD RUN BRANC vs every rated South Carolina bridge

Inventory load rating (metric tons), FHWA NBI, this state

20 Top 75% higher than 25% of 9,483 bridges

rated South Carolina bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
20.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Berkeley inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 216 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
4.7 m (15 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
081206000003150

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether BULLHEAD RUN BRANC is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BULLHEAD RUN BRANC against other structures in Berkeley and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BULLHEAD RUN BRANC?

BULLHEAD RUN BRANC in Berkeley, South Carolina has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is BULLHEAD RUN BRANC inspected?

BULLHEAD RUN BRANC's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BULLHEAD RUN BRANC is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BULLHEAD RUN BRANC?

BULLHEAD RUN BRANC has an NBI inventory load rating of 20.1 metric tons.

Who is responsible for maintaining BULLHEAD RUN BRANC?

BULLHEAD RUN BRANC is owned and maintained by U.S. Forest Service.

How old is BULLHEAD RUN BRANC and does age affect safety?

BULLHEAD RUN BRANC was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.