FHWA NBI 2024 Inspection record Public-domain dataset

Rock Creek Pkwy

Carrying Rock Creek Pkwy over Community Ditch

300 Ft East of McCaslin, Boulder, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
33 t Inventory load rating

Bridge Snapshot: Rock Creek Pkwy

The Rock Creek Pkwy bridge in Boulder, Colorado carries Rock Creek Pkwy over Community Ditch. It was built in 2000, making it 26 years old today. The structure is built primarily of concrete and spans 1 section, stretching 10.7 meters (35 feet) end to end. Daily traffic averages 7,760 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Rock Creek Pkwy compares

▼ 4.4
Load rating vs Colorado average (37.1 t)
Bottom 42%
Lower load rating than 58% of Colorado bridges
311
Bridges in Boulder · 7 in Poor condition
Rock Creek Pkwy 32.7 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
48.4 / 100 - historical 20–49.9 band
Structural adequacy /55
30.0
Serviceability /30
6.0
Essentiality /15
12.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2000
Material
Concrete
Number of Spans
1
Structure Length
10.7 m (35 ft)
Deck Width
39.9 m (131 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
7,760 vehicles/day
Structure Number
SUPER-ROKCKBL-B

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

Rock Creek Pkwy is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Rock Creek Pkwy against other structures in Boulder and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Rock Creek Pkwy?

Rock Creek Pkwy in Boulder, Colorado has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is Rock Creek Pkwy inspected?

Rock Creek Pkwy's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,760 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Rock Creek Pkwy is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Rock Creek Pkwy?

Rock Creek Pkwy has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining Rock Creek Pkwy?

Rock Creek Pkwy is owned and maintained by Town/Township Highway Agency.

How old is Rock Creek Pkwy and does age affect safety?

Rock Creek Pkwy was built in 2000, making it 26 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.