FHWA NBI 2024 Inspection record Public-domain dataset

FILLMORE STREET

Carrying FILLMORE STREET over LOCAL DRAINAGE

0.12 MI E OF YORK AVE, Adams, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
100 t Inventory load rating

Bridge Snapshot: FILLMORE STREET

The FILLMORE STREET bridge in Adams, Colorado carries FILLMORE STREET over LOCAL DRAINAGE. It was built in 2006, making it 20 years old today. The structure is built primarily of steel and spans 1 section, stretching 11.2 meters (37 feet) end to end. Daily traffic averages 1,566 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show superstructure at 6/9, substructure at 8/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 99.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FILLMORE STREET compares

▲ 62.8
Load rating vs Colorado average (37.1 t)
Top 3%
Higher load rating than 97% of Colorado bridges
535
Bridges in Adams · 33 in Poor condition
FILLMORE STREET 99.9 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
96.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Superstructure
6/9
Fair (5–6)
Substructure
8/9
Good (7–9)
Inventory Load Rating
99.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Steel
Number of Spans
1
Structure Length
11.2 m (37 ft)
Deck Width
21.2 m (70 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,566 vehicles/day
Structure Number
THN-FIL148-LOC

Condition Analysis

  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether FILLMORE STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FILLMORE STREET against other structures in Adams and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FILLMORE STREET?

FILLMORE STREET in Adams, Colorado, superstructure rating of 6/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is FILLMORE STREET inspected?

FILLMORE STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,566 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FILLMORE STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FILLMORE STREET?

FILLMORE STREET has an NBI inventory load rating of 99.9 metric tons.

Who is responsible for maintaining FILLMORE STREET?

FILLMORE STREET is owned and maintained by City/Municipal Highway Agency.

How old is FILLMORE STREET and does age affect safety?

FILLMORE STREET was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.