FHWA NBI 2024 Inspection record Public-domain dataset

NEW HARP RD PCT 2

Carrying NEW HARP RD PCT 2 over PANTHER CREEK

1.00 MI S OF FM 1655, Wise, Texas

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
8 t Inventory load rating Lower than 99% of rated Texas bridges

NEW HARP RD PCT 2 in Wise, Texas sits above 1% of rated Texas bridges on inventory load rating (8 t), while its 1928 build year is earlier than 99% of Wise's recorded-year cohort (264 bridges).

NEW HARP RD PCT 2 in Wise, Texas is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1928, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 3. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure TX:022490AA0203001

PRE-1950 · STEEL · SINGLE-SPAN · SUPER-LED · TRACE-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • SINGLE-SPAN Single span
  • SUPER-LED Superstructure-led
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: NEW HARP RD PCT 2

The NEW HARP RD PCT 2 bridge in Wise, Texas carries NEW HARP RD PCT 2 over PANTHER CREEK. It was built in 1928, making it 98 years old today. The structure is built primarily of steel and spans 1 section, stretching 21.3 meters (70 feet) end to end. Daily traffic averages 35 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 3/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How NEW HARP RD PCT 2 compares

▼ 20.8
Load rating vs Texas average (29.0 t; 56,715 of 56,729 rated)
264
Bridges in Wise · 3 in Poor condition

Age against the county: built in 1928, earlier than 262 of Wise's 264 bridges with a recorded construction year (99%), against a county median build year of 1996. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

NEW HARP RD PCT 2 8.2 t
Texas average (56,715 of 56,729 rated) 29.0 t

Live comparison across Texas bridges with a recorded inventory load rating (56,715 of 56,729 rated).

NEW HARP RD PCT 2 vs every rated Texas bridge

Inventory load rating (metric tons), FHWA NBI, this state

8 Top 99% higher than 1% of 56,715 bridges

rated Texas bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
3/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
8.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Wise inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 264 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1928
Material
Steel
Number of Spans
1
Structure Length
21.3 m (70 ft)
Deck Width
4.9 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
35 vehicles/day
Structure Number
022490AA0203001

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates poor at 3/9, with advanced deterioration recorded on the latest inspection.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

NEW HARP RD PCT 2 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare NEW HARP RD PCT 2 against other structures in Wise and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW HARP RD PCT 2?

NEW HARP RD PCT 2 in Wise, Texas has a deck rating of 6/9, superstructure rating of 3/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is NEW HARP RD PCT 2 inspected?

NEW HARP RD PCT 2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW HARP RD PCT 2 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW HARP RD PCT 2?

NEW HARP RD PCT 2 has an NBI inventory load rating of 8.2 metric tons.

Who is responsible for maintaining NEW HARP RD PCT 2?

NEW HARP RD PCT 2 is owned and maintained by County Highway Agency.

How old is NEW HARP RD PCT 2 and does age affect safety?

NEW HARP RD PCT 2 was built in 1928, making it 98 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.