FHWA NBI 2024 Inspection record Public-domain dataset

IH 35 NB AND SB

Carrying IH 35 NB AND SB over 6TH; 7TH AND 8TH STREETS

5.50 MI S OF US 183, Travis, Texas

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
39 t Inventory load rating Higher than 94% of rated Texas bridges

IH 35 NB AND SB in Travis, Texas sits above 94% of rated Texas bridges on inventory load rating (39 t), while its 1962 build year is earlier than 84% of Travis's recorded-year cohort (1,544 bridges).

IH 35 NB AND SB in Travis, Texas is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1962, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure TX:142270001513191

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 15 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: IH 35 NB AND SB

The IH 35 NB AND SB bridge in Travis, Texas carries IH 35 NB AND SB over 6TH; 7TH AND 8TH STREETS. It was built in 1962, making it 64 years old today. The structure is built primarily of prestressed concrete and spans 15 sections, stretching 273.4 meters (897 feet) end to end. Daily traffic averages 143,744 vehicles, placing it in the heavily-trafficked tier of Texas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How IH 35 NB AND SB compares

▲ 10.0
Load rating vs Texas average (29.0 t; 56,715 of 56,729 rated)
1,544
Bridges in Travis · 3 in Poor condition

Age against the county: built in 1962, earlier than 1,291 of Travis's 1,544 bridges with a recorded construction year (84%), against a county median build year of 1993. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

IH 35 NB AND SB 39.0 t
Texas average (56,715 of 56,729 rated) 29.0 t

Live comparison across Texas bridges with a recorded inventory load rating (56,715 of 56,729 rated).

IH 35 NB AND SB vs every rated Texas bridge

Inventory load rating (metric tons), FHWA NBI, this state

39 Top 6% higher than 94% of 56,715 bridges

rated Texas bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
39.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Travis inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,544 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1962
Material
Prestressed Concrete
Number of Spans
15
Structure Length
273.4 m (897 ft)
Deck Width
31.0 m (102 ft)
Owner
State Highway Agency
Avg Daily Traffic
143,744 vehicles/day
Structure Number
142270001513191

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether IH 35 NB AND SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IH 35 NB AND SB against other structures in Travis and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IH 35 NB AND SB?

IH 35 NB AND SB in Travis, Texas has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is IH 35 NB AND SB inspected?

IH 35 NB AND SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 143,744 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IH 35 NB AND SB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IH 35 NB AND SB?

IH 35 NB AND SB has an NBI inventory load rating of 39.0 metric tons.

Who is responsible for maintaining IH 35 NB AND SB?

IH 35 NB AND SB is owned and maintained by State Highway Agency.

How old is IH 35 NB AND SB and does age affect safety?

IH 35 NB AND SB was built in 1962, making it 64 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.