FHWA NBI 2024 Inspection record Public-domain dataset

CR SW 3130

Carrying CR SW 3130 over Post Oak Creek

1.95 MI S OF SH 31, Navarro, Texas

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating Higher than 53% of rated Texas bridges

CR SW 3130 in Navarro, Texas sits above 53% of rated Texas bridges on inventory load rating (33 t), while its 2008 build year is earlier than 18% of Navarro's recorded-year cohort (345 bridges).

CR SW 3130 in Navarro, Texas is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2008, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure TX:181750AA0588001

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · TRACE-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • TRACE-ADT Trace ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CR SW 3130

The CR SW 3130 bridge in Navarro, Texas carries CR SW 3130 over Post Oak Creek. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 24.4 meters (80 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How CR SW 3130 compares

▲ 3.7
Load rating vs Texas average (29.0 t; 56,715 of 56,729 rated)
345
Bridges in Navarro · 4 in Poor condition

Age against the county: built in 2008, earlier than 61 of Navarro's 345 bridges with a recorded construction year (18%), against a county median build year of 1985. This is one of the newer structures in its county.

CR SW 3130 32.7 t
Texas average (56,715 of 56,729 rated) 29.0 t

Live comparison across Texas bridges with a recorded inventory load rating (56,715 of 56,729 rated).

CR SW 3130 vs every rated Texas bridge

Inventory load rating (metric tons), FHWA NBI, this state

33 Top 47% higher than 53% of 56,715 bridges

rated Texas bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Navarro inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 345 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2008
Material
Prestressed Concrete
Number of Spans
1
Structure Length
24.4 m (80 ft)
Deck Width
7.9 m (26 ft)
Owner
County Highway Agency
Avg Daily Traffic
30 vehicles/day
Structure Number
181750AA0588001

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CR SW 3130 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR SW 3130 against other structures in Navarro and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR SW 3130?

CR SW 3130 in Navarro, Texas has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CR SW 3130 inspected?

CR SW 3130's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR SW 3130 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR SW 3130?

CR SW 3130 has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining CR SW 3130?

CR SW 3130 is owned and maintained by County Highway Agency.

How old is CR SW 3130 and does age affect safety?

CR SW 3130 was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.