FHWA NBI 2024 Inspection record Public-domain dataset

980 NORTH AM FORK

Carrying 980 NORTH AM FORK over AMERICAN FORK RIVER

ART DYE PARK AMER. FORK, Utah, Utah

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
71 t Inventory load rating Higher than 94% of rated Utah bridges

980 NORTH AM FORK in Utah, Utah sits above 94% of rated Utah bridges on inventory load rating (71 t), while its 2015 build year is earlier than 9% of Utah's recorded-year cohort (271 bridges).

980 NORTH AM FORK in Utah, Utah is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2015, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure UT:049108E

POST-2000 · CONCRETE · SINGLE-SPAN · CULVERT-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • CULVERT-LED Culvert-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 980 NORTH AM FORK

The 980 NORTH AM FORK bridge in Utah, Utah carries 980 NORTH AM FORK over AMERICAN FORK RIVER. It was built in 2015, making it 11 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.7 meters (38 feet) end to end. Daily traffic averages 3,201 vehicles, placing it in the moderately-trafficked tier of Utah bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How 980 NORTH AM FORK compares

▲ 34.2
Load rating vs Utah average (36.4 t; 3,113 of 3,125 rated)
271
Bridges in Utah · 3 in Poor condition

Age against the county: built in 2015, earlier than 24 of Utah's 271 bridges with a recorded construction year (9%), against a county median build year of 2006. This is one of the newer structures in its county.

980 NORTH AM FORK 70.6 t
Utah average (3,113 of 3,125 rated) 36.4 t

Live comparison across Utah bridges with a recorded inventory load rating (3,113 of 3,125 rated).

980 NORTH AM FORK vs every rated Utah bridge

Inventory load rating (metric tons), FHWA NBI, this state

71 Top 6% higher than 94% of 3,113 bridges

rated Utah bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
7/9
Good (7–9)
Inventory Load Rating
70.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Utah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 271 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2015
Material
Concrete
Number of Spans
1
Structure Length
11.7 m (38 ft)
0
Owner
City/Municipal Highway Agency
Avg Daily Traffic
3,201 vehicles/day
Structure Number
049108E

How to read this record

This page shows what the last federal inspection recorded, not whether 980 NORTH AM FORK is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 980 NORTH AM FORK against other structures in Utah and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 980 NORTH AM FORK?

980 NORTH AM FORK in Utah, Utah on the FHWA's 0–9 scale.

How often is 980 NORTH AM FORK inspected?

980 NORTH AM FORK's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,201 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 980 NORTH AM FORK is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 980 NORTH AM FORK?

980 NORTH AM FORK has an NBI inventory load rating of 70.6 metric tons.

Who is responsible for maintaining 980 NORTH AM FORK?

980 NORTH AM FORK is owned and maintained by City/Municipal Highway Agency.

How old is 980 NORTH AM FORK and does age affect safety?

980 NORTH AM FORK was built in 2015, making it 11 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.