FHWA NBI 2024 Inspection record Public-domain dataset

CAMINO DEL RIO RD.

Carrying CAMINO DEL RIO RD. over VIRGIN RIVER

RIVERWD.HLW.SUB.IN VIRGIN, Washington, Utah

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
38 t Inventory load rating Higher than 66% of rated Utah bridges

CAMINO DEL RIO RD. in Washington, Utah sits above 66% of rated Utah bridges on inventory load rating (38 t), while its 2007 build year is earlier than 34% of Washington's recorded-year cohort (177 bridges).

CAMINO DEL RIO RD. in Washington, Utah is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 2007, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure UT:053006F

POST-2000 · PRESTRESS · MULTI-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CAMINO DEL RIO RD.

The CAMINO DEL RIO RD. bridge in Washington, Utah carries CAMINO DEL RIO RD. over VIRGIN RIVER. It was built in 2007, making it 19 years old today. The structure is built primarily of prestressed concrete and spans 2 sections, stretching 60.8 meters (199 feet) end to end. Daily traffic averages 1,260 vehicles, placing it in the moderately-trafficked tier of Utah bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How CAMINO DEL RIO RD. compares

▲ 1.5
Load rating vs Utah average (36.4 t; 3,113 of 3,125 rated)
177
Bridges in Washington · 2 in Poor condition

Age against the county: built in 2007, earlier than 61 of Washington's 177 bridges with a recorded construction year (34%), against a county median build year of 1996. This is one of the newer structures in its county.

CAMINO DEL RIO RD. 37.9 t
Utah average (3,113 of 3,125 rated) 36.4 t

Live comparison across Utah bridges with a recorded inventory load rating (3,113 of 3,125 rated).

CAMINO DEL RIO RD. vs every rated Utah bridge

Inventory load rating (metric tons), FHWA NBI, this state

38 Top 34% higher than 66% of 3,113 bridges

rated Utah bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
37.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Washington inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 177 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2007
Material
Prestressed Concrete
Number of Spans
2
Structure Length
60.8 m (199 ft)
Deck Width
12.2 m (40 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,260 vehicles/day
Structure Number
053006F

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CAMINO DEL RIO RD. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CAMINO DEL RIO RD. against other structures in Washington and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CAMINO DEL RIO RD.?

CAMINO DEL RIO RD. in Washington, Utah has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CAMINO DEL RIO RD. inspected?

CAMINO DEL RIO RD.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,260 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CAMINO DEL RIO RD. is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CAMINO DEL RIO RD.?

CAMINO DEL RIO RD. has an NBI inventory load rating of 37.9 metric tons.

Who is responsible for maintaining CAMINO DEL RIO RD.?

CAMINO DEL RIO RD. is owned and maintained by Town/Township Highway Agency.

How old is CAMINO DEL RIO RD. and does age affect safety?

CAMINO DEL RIO RD. was built in 2007, making it 19 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.