FHWA NBI 2024 Inspection record Public-domain dataset

RAMP I80EB to I15N

Carrying RAMP I80EB to I15N over 1000 WEST STREET

250 SO.1000 WEST IN SLC., Salt Lake, Utah

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
45 t Inventory load rating Higher than 79% of rated Utah bridges

RAMP I80EB to I15N in Salt Lake, Utah sits above 79% of rated Utah bridges on inventory load rating (45 t), while its 1999 build year is earlier than 39% of Salt Lake's recorded-year cohort (659 bridges).

RAMP I80EB to I15N in Salt Lake, Utah is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1999, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure UT:2F 645

LATE-CENTURY · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RAMP I80EB to I15N

The RAMP I80EB to I15N bridge in Salt Lake, Utah carries RAMP I80EB to I15N over 1000 WEST STREET. It was built in 1999, making it 27 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 39.0 meters (128 feet) end to end. Daily traffic averages 6,274 vehicles, placing it in the moderately-trafficked tier of Utah bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How RAMP I80EB to I15N compares

▲ 8.6
Load rating vs Utah average (36.4 t; 3,113 of 3,125 rated)
659
Bridges in Salt Lake · 25 in Poor condition

Age against the county: built in 1999, earlier than 255 of Salt Lake's 659 bridges with a recorded construction year (39%), against a county median build year of 1998. This is one of the newer structures in its county.

RAMP I80EB to I15N 45.0 t
Utah average (3,113 of 3,125 rated) 36.4 t

Live comparison across Utah bridges with a recorded inventory load rating (3,113 of 3,125 rated).

RAMP I80EB to I15N vs every rated Utah bridge

Inventory load rating (metric tons), FHWA NBI, this state

45 Top 21% higher than 79% of 3,113 bridges

rated Utah bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
45.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Salt Lake inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 659 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1999
Material
Prestressed Concrete
Number of Spans
1
Structure Length
39.0 m (128 ft)
Deck Width
9.3 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,274 vehicles/day
Structure Number
2F 645

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMP I80EB to I15N is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMP I80EB to I15N against other structures in Salt Lake and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMP I80EB to I15N?

RAMP I80EB to I15N in Salt Lake, Utah has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RAMP I80EB to I15N inspected?

RAMP I80EB to I15N's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,274 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMP I80EB to I15N is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMP I80EB to I15N?

RAMP I80EB to I15N has an NBI inventory load rating of 45.0 metric tons.

Who is responsible for maintaining RAMP I80EB to I15N?

RAMP I80EB to I15N is owned and maintained by State Highway Agency.

How old is RAMP I80EB to I15N and does age affect safety?

RAMP I80EB to I15N was built in 1999, making it 27 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.