FHWA NBI 2024 Inspection record Public-domain dataset

I-215 (SR-215) WBL

Carrying I-215 (SR-215) WBL over JORDAN RIVER

1100 WEST 6200 SO. SL CO., Salt Lake, Utah

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
22 t Inventory load rating Lower than 82% of rated Utah bridges

I-215 (SR-215) WBL in Salt Lake, Utah sits above 18% of rated Utah bridges on inventory load rating (22 t), while its 1971 build year is earlier than 86% of Salt Lake's recorded-year cohort (659 bridges).

I-215 (SR-215) WBL in Salt Lake, Utah is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1971, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure UT:4F 133

INTERSTATE-ERA · PRESTRESS · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I-215 (SR-215) WBL

The I-215 (SR-215) WBL bridge in Salt Lake, Utah carries I-215 (SR-215) WBL over JORDAN RIVER. It was built in 1971, making it 55 years old today. It was last reconstructed in 2003, extending its service life. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 39.6 meters (130 feet) end to end. Daily traffic averages 106,756 vehicles, placing it in the heavily-trafficked tier of Utah bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How I-215 (SR-215) WBL compares

▼ 14.0
Load rating vs Utah average (36.4 t; 3,113 of 3,125 rated)
659
Bridges in Salt Lake · 25 in Poor condition

Age against the county: built in 1971, earlier than 567 of Salt Lake's 659 bridges with a recorded construction year (86%), against a county median build year of 1998. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I-215 (SR-215) WBL 22.4 t
Utah average (3,113 of 3,125 rated) 36.4 t

Live comparison across Utah bridges with a recorded inventory load rating (3,113 of 3,125 rated).

I-215 (SR-215) WBL vs every rated Utah bridge

Inventory load rating (metric tons), FHWA NBI, this state

22 Top 82% higher than 18% of 3,113 bridges

rated Utah bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
22.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Salt Lake inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 659 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1971
Last Reconstructed
2003
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
39.6 m (130 ft)
Deck Width
23.8 m (78 ft)
Owner
State Highway Agency
Avg Daily Traffic
106,756 vehicles/day
Structure Number
4F 133

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether I-215 (SR-215) WBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-215 (SR-215) WBL against other structures in Salt Lake and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-215 (SR-215) WBL?

I-215 (SR-215) WBL in Salt Lake, Utah has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I-215 (SR-215) WBL inspected?

I-215 (SR-215) WBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 106,756 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-215 (SR-215) WBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-215 (SR-215) WBL?

I-215 (SR-215) WBL has an NBI inventory load rating of 22.4 metric tons.

Who is responsible for maintaining I-215 (SR-215) WBL?

I-215 (SR-215) WBL is owned and maintained by State Highway Agency.

How old is I-215 (SR-215) WBL and does age affect safety?

I-215 (SR-215) WBL was built in 1971, making it 55 years old and last reconstructed in 2003.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.