FHWA NBI 2024 Inspection record Public-domain dataset

CHIPPENHAM PKWY NB

Carrying CHIPPENHAM PKWY NB over CSX TRANS & STRATHMOR RD

.14 FR 1607/.57 to 1601, Chesterfield, Virginia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
44 t Inventory load rating Lower than 52% of rated Virginia bridges

CHIPPENHAM PKWY NB in Chesterfield, Virginia sits above 48% of rated Virginia bridges on inventory load rating (44 t), while its 1965 build year is earlier than 80% of Chesterfield's recorded-year cohort (322 bridges).

CHIPPENHAM PKWY NB in Chesterfield, Virginia is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure VA:000000000005105

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CHIPPENHAM PKWY NB

The CHIPPENHAM PKWY NB bridge in Chesterfield, Virginia carries CHIPPENHAM PKWY NB over CSX TRANS & STRATHMOR RD. It was built in 1965, making it 61 years old today. It was last reconstructed in 2002, extending its service life. The structure is built primarily of steel and spans 4 sections, stretching 61.6 meters (202 feet) end to end. Daily traffic averages 32,417 vehicles, placing it in the heavily-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How CHIPPENHAM PKWY NB compares

▼ 3.1
Load rating vs Virginia average (46.6 t; 14,112 of 14,120 rated)
322
Bridges in Chesterfield · 8 in Poor condition

Age against the county: built in 1965, earlier than 257 of Chesterfield's 322 bridges with a recorded construction year (80%), against a county median build year of 1988. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

CHIPPENHAM PKWY NB 43.5 t
Virginia average (14,112 of 14,120 rated) 46.6 t

Live comparison across Virginia bridges with a recorded inventory load rating (14,112 of 14,120 rated).

CHIPPENHAM PKWY NB vs every rated Virginia bridge

Inventory load rating (metric tons), FHWA NBI, this state

44 Top 52% higher than 48% of 14,112 bridges

rated Virginia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
43.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Chesterfield inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 322 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Last Reconstructed
2002
Material
Steel
Number of Spans
4
Structure Length
61.6 m (202 ft)
Deck Width
20.5 m (67 ft)
Owner
State Highway Agency
Avg Daily Traffic
32,417 vehicles/day
Structure Number
000000000005105

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CHIPPENHAM PKWY NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHIPPENHAM PKWY NB against other structures in Chesterfield and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHIPPENHAM PKWY NB?

CHIPPENHAM PKWY NB in Chesterfield, Virginia has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CHIPPENHAM PKWY NB inspected?

CHIPPENHAM PKWY NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 32,417 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHIPPENHAM PKWY NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHIPPENHAM PKWY NB?

CHIPPENHAM PKWY NB has an NBI inventory load rating of 43.5 metric tons.

Who is responsible for maintaining CHIPPENHAM PKWY NB?

CHIPPENHAM PKWY NB is owned and maintained by State Highway Agency.

How old is CHIPPENHAM PKWY NB and does age affect safety?

CHIPPENHAM PKWY NB was built in 1965, making it 61 years old and last reconstructed in 2002.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.