FHWA NBI 2024 Inspection record Public-domain dataset

EBL BOW. GREEN BYP

Carrying EBL BOW. GREEN BYP over RTE. 301 (RTE. 2)

1.0M RT207 BUS-0.7M RT619, Caroline, Virginia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating Lower than 66% of rated Virginia bridges

EBL BOW. GREEN BYP in Caroline, Virginia sits above 34% of rated Virginia bridges on inventory load rating (35 t), while its 2002 build year is earlier than 20% of Caroline's recorded-year cohort (107 bridges).

EBL BOW. GREEN BYP in Caroline, Virginia is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 2002, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure VA:000000000026017

POST-2000 · STEEL · MULTI-SPAN · DECK-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • POST-2000 2000+
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • DECK-LED Deck-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: EBL BOW. GREEN BYP

The EBL BOW. GREEN BYP bridge in Caroline, Virginia carries EBL BOW. GREEN BYP over RTE. 301 (RTE. 2). It was built in 2002, making it 24 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 59.1 meters (194 feet) end to end. Daily traffic averages 5,084 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How EBL BOW. GREEN BYP compares

▼ 11.8
Load rating vs Virginia average (46.6 t; 14,112 of 14,120 rated)
107
Bridges in Caroline · 5 in Poor condition

Age against the county: built in 2002, earlier than 21 of Caroline's 107 bridges with a recorded construction year (20%), against a county median build year of 1970. This is one of the newer structures in its county.

EBL BOW. GREEN BYP 34.8 t
Virginia average (14,112 of 14,120 rated) 46.6 t

Live comparison across Virginia bridges with a recorded inventory load rating (14,112 of 14,120 rated).

EBL BOW. GREEN BYP vs every rated Virginia bridge

Inventory load rating (metric tons), FHWA NBI, this state

35 Top 66% higher than 34% of 14,112 bridges

rated Virginia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
34.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Caroline inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 107 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2002
Material
Steel Continuous
Number of Spans
2
Structure Length
59.1 m (194 ft)
Deck Width
13.2 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,084 vehicles/day
Structure Number
000000000026017

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether EBL BOW. GREEN BYP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare EBL BOW. GREEN BYP against other structures in Caroline and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for EBL BOW. GREEN BYP?

EBL BOW. GREEN BYP in Caroline, Virginia has a deck rating of 6/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is EBL BOW. GREEN BYP inspected?

EBL BOW. GREEN BYP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,084 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. EBL BOW. GREEN BYP is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for EBL BOW. GREEN BYP?

EBL BOW. GREEN BYP has an NBI inventory load rating of 34.8 metric tons.

Who is responsible for maintaining EBL BOW. GREEN BYP?

EBL BOW. GREEN BYP is owned and maintained by State Highway Agency.

How old is EBL BOW. GREEN BYP and does age affect safety?

EBL BOW. GREEN BYP was built in 2002, making it 24 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.