FHWA NBI 2024 Inspection record Public-domain dataset

C2001

Carrying C2001 over E. BR. PASSUMPSIC RIVER

0.1 MI JCT TH 1 + VT 114, Essex, Vermont

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
8 t Inventory load rating Lower than 97% of rated Vermont bridges

C2001 in Essex, Vermont sits above 3% of rated Vermont bridges on inventory load rating (8 t), while its 1915 build year is earlier than 92% of Essex's recorded-year cohort (66 bridges).

C2001 in Essex, Vermont is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1915, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure VT:100508001305081

PRE-1950 · STEEL · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · LIGHT-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: C2001

The C2001 bridge in Essex, Vermont carries C2001 over E. BR. PASSUMPSIC RIVER. It was built in 1915, making it 111 years old today. It was last reconstructed in 1928, extending its service life. The structure is built primarily of steel and spans 2 sections, stretching 19.5 meters (64 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Vermont bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How C2001 compares

▼ 29.2
Load rating vs Vermont average (37.4 t; 2,861 of 2,862 rated)
66
Bridges in Essex · 2 in Poor condition

Age against the county: built in 1915, earlier than 61 of Essex's 66 bridges with a recorded construction year (92%), against a county median build year of 1971. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

C2001 8.2 t
Vermont average (2,861 of 2,862 rated) 37.4 t

Live comparison across Vermont bridges with a recorded inventory load rating (2,861 of 2,862 rated).

C2001 vs every rated Vermont bridge

Inventory load rating (metric tons), FHWA NBI, this state

8 Top 97% higher than 3% of 2,861 bridges

rated Vermont bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
8.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Essex inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 66 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1915
Last Reconstructed
1928
Material
Steel
Number of Spans
2
Structure Length
19.5 m (64 ft)
Deck Width
5.1 m (17 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
100508001305081

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether C2001 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C2001 against other structures in Essex and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C2001?

C2001 in Essex, Vermont has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is C2001 inspected?

C2001's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C2001 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C2001?

C2001 has an NBI inventory load rating of 8.2 metric tons.

Who is responsible for maintaining C2001?

C2001 is owned and maintained by Town/Township Highway Agency.

How old is C2001 and does age affect safety?

C2001 was built in 1915, making it 111 years old and last reconstructed in 1928.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.