FHWA NBI 2024 Inspection record Public-domain dataset

VT 00009 ML

Carrying VT 00009 ML over N. BR. DEERFIELD RIVER

0.1 MI W JCT VT 100 N, Windham, Vermont

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
31 t Inventory load rating Lower than 69% of rated Vermont bridges

VT 00009 ML in Windham, Vermont sits above 31% of rated Vermont bridges on inventory load rating (31 t), while its 1934 build year is earlier than 83% of Windham's recorded-year cohort (337 bridges).

VT 00009 ML in Windham, Vermont is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1934, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure VT:200010003113222

PRE-1950 · CONCRETE · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: VT 00009 ML

The VT 00009 ML bridge in Windham, Vermont carries VT 00009 ML over N. BR. DEERFIELD RIVER. It was built in 1934, making it 92 years old today. The structure is built primarily of concrete and spans 1 section, stretching 18.0 meters (59 feet) end to end. Daily traffic averages 4,400 vehicles, placing it in the moderately-trafficked tier of Vermont bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How VT 00009 ML compares

▼ 6.6
Load rating vs Vermont average (37.4 t; 2,861 of 2,862 rated)
337
Bridges in Windham · 17 in Poor condition

Age against the county: built in 1934, earlier than 281 of Windham's 337 bridges with a recorded construction year (83%), against a county median build year of 1958. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

VT 00009 ML 30.8 t
Vermont average (2,861 of 2,862 rated) 37.4 t

Live comparison across Vermont bridges with a recorded inventory load rating (2,861 of 2,862 rated).

VT 00009 ML vs every rated Vermont bridge

Inventory load rating (metric tons), FHWA NBI, this state

31 Top 69% higher than 31% of 2,861 bridges

rated Vermont bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
30.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Windham inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 337 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1934
Material
Concrete
Number of Spans
1
Structure Length
18.0 m (59 ft)
Deck Width
12.9 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,400 vehicles/day
Structure Number
200010003113222

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

VT 00009 ML is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare VT 00009 ML against other structures in Windham and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for VT 00009 ML?

VT 00009 ML in Windham, Vermont has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is VT 00009 ML inspected?

VT 00009 ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. VT 00009 ML is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for VT 00009 ML?

VT 00009 ML has an NBI inventory load rating of 30.8 metric tons.

Who is responsible for maintaining VT 00009 ML?

VT 00009 ML is owned and maintained by State Highway Agency.

How old is VT 00009 ML and does age affect safety?

VT 00009 ML was built in 1934, making it 92 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.