FHWA NBI 2024 Inspection record Public-domain dataset

VT 00107 ML

Carrying VT 00107 ML over LITTLE STONY BROOK

3.8 MI E JCT. VT.100, Windsor, Vermont

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating Lower than 70% of rated Vermont bridges

VT 00107 ML in Windsor, Vermont sits above 30% of rated Vermont bridges on inventory load rating (30 t), while its 1934 build year is earlier than 82% of Windsor's recorded-year cohort (483 bridges).

VT 00107 ML in Windsor, Vermont is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1934, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure VT:200022001014192

PRE-1950 · CONCRETE · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: VT 00107 ML

The VT 00107 ML bridge in Windsor, Vermont carries VT 00107 ML over LITTLE STONY BROOK. It was built in 1934, making it 92 years old today. It was last reconstructed in 1979, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 11.6 meters (38 feet) end to end. Daily traffic averages 3,500 vehicles, placing it in the moderately-trafficked tier of Vermont bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How VT 00107 ML compares

▼ 7.5
Load rating vs Vermont average (37.4 t; 2,861 of 2,862 rated)
483
Bridges in Windsor · 20 in Poor condition

Age against the county: built in 1934, earlier than 395 of Windsor's 483 bridges with a recorded construction year (82%), against a county median build year of 1966. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

VT 00107 ML 29.9 t
Vermont average (2,861 of 2,862 rated) 37.4 t

Live comparison across Vermont bridges with a recorded inventory load rating (2,861 of 2,862 rated).

VT 00107 ML vs every rated Vermont bridge

Inventory load rating (metric tons), FHWA NBI, this state

30 Top 70% higher than 30% of 2,861 bridges

rated Vermont bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Windsor inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 483 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1934
Last Reconstructed
1979
Material
Concrete
Number of Spans
1
Structure Length
11.6 m (38 ft)
Deck Width
11.9 m (39 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,500 vehicles/day
Structure Number
200022001014192

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether VT 00107 ML is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare VT 00107 ML against other structures in Windsor and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for VT 00107 ML?

VT 00107 ML in Windsor, Vermont has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is VT 00107 ML inspected?

VT 00107 ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. VT 00107 ML is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for VT 00107 ML?

VT 00107 ML has an NBI inventory load rating of 29.9 metric tons.

Who is responsible for maintaining VT 00107 ML?

VT 00107 ML is owned and maintained by State Highway Agency.

How old is VT 00107 ML and does age affect safety?

VT 00107 ML was built in 1934, making it 92 years old and last reconstructed in 1979.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.