FHWA NBI 2024 Inspection record Public-domain dataset

HWY FEARING HILL

Carrying HWY FEARING HILL over WATER WEWEANTIC RIVER

JUST N OF HORSESHOE POND, Plymouth, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: HWY FEARING HILL

The HWY FEARING HILL bridge in Plymouth, Massachusetts carries HWY FEARING HILL over WATER WEWEANTIC RIVER. It was built in 1900, making it 126 years old today. It was last reconstructed in 1930, extending its service life. The structure is built primarily of steel and spans 2 sections, stretching 8.5 meters (28 feet) end to end. Daily traffic averages 9,300 vehicles, placing it in the moderately-trafficked tier of Massachusetts bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 3/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 25.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY FEARING HILL compares

▼ 15.8
Load rating vs Massachusetts average (41.2 t)
Bottom 12%
Lower load rating than 88% of Massachusetts bridges
287
Bridges in Plymouth · 16 in Poor condition
HWY FEARING HILL 25.4 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
22.5 / 100 - historical 20–49.9 band
Structural adequacy /55
9.0
Serviceability /30
6.0
Essentiality /15
7.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
25.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1900
Last Reconstructed
1930
Material
Steel
Number of Spans
2
Structure Length
8.5 m (28 ft)
Deck Width
10.3 m (34 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
9,300 vehicles/day
Structure Number
W0600642EMUNNBI

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 3/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

HWY FEARING HILL is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HWY FEARING HILL against other structures in Plymouth and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY FEARING HILL?

HWY FEARING HILL in Plymouth, Massachusetts has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is HWY FEARING HILL inspected?

HWY FEARING HILL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY FEARING HILL is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY FEARING HILL?

HWY FEARING HILL has an NBI inventory load rating of 25.4 metric tons.

Who is responsible for maintaining HWY FEARING HILL?

HWY FEARING HILL is owned and maintained by Town/Township Highway Agency.

How old is HWY FEARING HILL and does age affect safety?

HWY FEARING HILL was built in 1900, making it 126 years old and last reconstructed in 1930.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.