US 20 SPRINGFLD RD
Carrying US 20 SPRINGFLD RD over WATER WESTFIELD RIVER
.1 M E JCT ST 187, Hampden, Massachusetts
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: US 20 SPRINGFLD RD
The US 20 SPRINGFLD RD bridge in Hampden, Massachusetts carries US 20 SPRINGFLD RD over WATER WESTFIELD RIVER. It was built in 2005, making it 21 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 115.5 meters (379 feet) end to end. Daily traffic averages 20,504 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 58.4 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How US 20 SPRINGFLD RD compares
Live comparison across Massachusetts.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2005
- Material
- Steel Continuous
- Number of Spans
- 3
- Structure Length
- 115.5 m (379 ft)
- Deck Width
- 22.7 m (74 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 20,504 vehicles/day
- Structure Number
- W25004AX1DOTNBI
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
- • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
- • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.
How to read this record
This page shows what the last federal inspection recorded, not whether US 20 SPRINGFLD RD is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare US 20 SPRINGFLD RD against other structures in Hampden and across Massachusetts. Massachusetts bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for US 20 SPRINGFLD RD?
US 20 SPRINGFLD RD in Hampden, Massachusetts has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is US 20 SPRINGFLD RD inspected?
US 20 SPRINGFLD RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20,504 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. US 20 SPRINGFLD RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for US 20 SPRINGFLD RD?
US 20 SPRINGFLD RD has an NBI inventory load rating of 58.4 metric tons.
Who is responsible for maintaining US 20 SPRINGFLD RD?
US 20 SPRINGFLD RD is owned and maintained by State Highway Agency.
How old is US 20 SPRINGFLD RD and does age affect safety?
US 20 SPRINGFLD RD was built in 2005, making it 21 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.